Powered by Made-in-China.com
Square Hollow Section Steel Pipe - Carbon & Galvanized
US$500.00
5-24 Tons
US$490.00
25-49 Tons
US$470.00
50+ Tons
Product profile
Customization
AvailableApplication
ConstructionPipe Diameter
10*10-600*600mmModel NO.
Seamless and WeldedPipe Length
6000 mm-12000 mmSurface Finish
GalvanizedTemperature Classification
Room Temperature PipingMPa Classfication
Medium Pressure PipingMaterial
Carbon SteelStandard
ASTM, DIN, JISConnection Type
WeldingDiameter
50*50 - 450*450mmMedium
Construction, Bridge, BuildingCross-Section Shape
Square and RectangularTransport Package
Sea Worthy PackingSpecification
AS/NZS 1163: C250L0, C350L0Trademark
Chief SteelOrigin
ChinaHS Code
730661000Production Capacity
100000 Tons/YearKey features
Customizable Dimensions: Available in sizes from 10*10mm to 600*600mm with wall thickness 0.3-30mm.
Multiple Material Grades: Offers Q195, Q215, Q235, and Q345 carbon steel options.
Versatile Surface Finishes: Options include black bare, galvanized, oiled, painted, or powder coated.
Fast Stock Delivery: Lead time within 7 days for 6m length items available in stock.
Custom Length Options: Provides fixed, random, or customized lengths based on customer request.
Third-Party Inspection: Welcomes TUV inspections with MTC provided and stamped by TPI.
Value-Added Services: Includes in-house painting, coating, cutting, welding, and mechanical fabrication.
Free Sample Availability: Free samples provided, though freight costs are not covered.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure
Our Industry Experience & Global Business Record
Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East
Product Q&A
Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make machanical fabricate per to request.
Send Inquiry
*To:
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Rectangle Steel Pipe Custom Size Hollow Section Pipe Carbon Square Tube
US$450.00-550.00
1 Ton(MOQ)
Q235 Q345 Q355 Carbon Steel Square Pipe Hollow Section
US$900.00-1,200.00
3 Tons(MOQ)
Galvanized Carbon Steel Hollow Section Pipe for Construction
US$500.00
5 Pieces(MOQ)
Alloy Hot Rolled Hollow Section Welded Steel Round Pipe Carbon Steel Tube
US$558.00-760.00
1 Ton(MOQ)
1/8-6 Inch High Quality Low Carbon Round/Hollow Section Pipes
US$850.00-900.00
10 Tons(MOQ)
Hot Dipped Gi Galvanized Carbon Round Square Rectangular Seamless Steel Tube Pipe
US$438.00-458.00
1 Ton(MOQ)



















