SourcingAI
Try for free
Powered by Made-in-China.com
SSAW Spiral Welded Carbon Pipe for Oil & Gas
US$450.00-1,000.00
5 Tons

Product profile

Customization

Available

Type

Welded

Technique

SAW

Model NO.

SSAW Steel Pipe

Material

Carbon Steel

Surface Treatment

Black

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Outer Diameter

219mm-3200mm

Pipe End

Plain / Beveled

Manufacturing Technique

SSAW Spiral Submerged Arc Welded

Application

Oil, Gas, Water, Piling

Transport Package

in Bulk

Specification

CE, AS, JIS, EN

Trademark

Chief Steel

Origin

China

HS Code

73051900

Production Capacity

200000 Tons/Year

Key features

Wide Size Range: OD: 219-3220mm, Thickness: 4-25.4mm, Length: 12m-80m per request
Multiple Material Grades: Available in GR.B-X80, S275JR/J0/K2H, S355J0H, S355J2H, St52-0, etc.
Comprehensive Standards: Meets EN10219, ASTM A252, ASTM A53, A-PI5L, CE, AS, JIS, EN standards
Customizable Surface Treatment: Options include bare, oil, bitumen, 1-3 layer PE, Juton coating, and anti-corrosion
Flexible End Types: Plain or Beveled ends, protectable by plastic pipe caps
Rigorous Inspection: Hydraulic testing, Eddy Current, Infrared, X-Ray, and chemical/physical property inspection
Value-Added Services: In-house painting, coating, cutting, jointed welding, and mechanical fabrication available
Fast Delivery Options: 5-10 days for stock items, 15-20 days for production based on quantity

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤6.95hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like