SourcingAI
Try for free
Powered by Made-in-China.com
100kw 500V Maxwell EV Super Fast Charging Module for EV Charger Station
US$3,500.00
5-499 Pieces
US$3,450.00
500+ Pieces
Sample price:US$3500.00/piece.Request sample

Product profile

Customization

Available

Type

Fast EV Charging Station

Product Name

100kw 500V EV DC Charging Module

Model NO.

MXR500100B

Power Supply

3phase+PE

Communication Mode

Can Bus

Input Voltage

508-622VAC

Input Current

<120A

Output Voltage

0-500VDC

Output Current

0-200A

Cooling Method

Forced Air Cooling

Warranty

12 Months

Transport Package

by Wooden Carton or Kraft Carton, by Air or by Sea

Specification

125*440*430mm

Trademark

Maxwell

Origin

Hebei

HS Code

8504409999

Production Capacity

10, 000/PCS Per Month

Key features

Ultra-Wide Constant Power: Features ultra-wide constant power range and high full-load operating temperature for superior performance.
Wide Output Voltage Range: Supports 0-500VDC output voltage range with 100kW output power and 0-200A current.
Robust Protection Features: Includes over/under voltage, surge, over-current, and short-circuit protection on input and output sides.
Certified Quality & Safety: Products have passed CE and UL certifications, ensuring compliance with international safety standards.
Flexible Customization Options: Offers full customization, minor customization, and customization from samples or designs.
Compact Dimensions: Compact design measuring 125mm(H)*440mm(W)*430mm(D) for easy integration into charging stations.
12 Months Warranty: Comprehensive 12-month warranty coverage for peace of mind and reliable long-term operation.

Company profile

Shijiazhuang Maxwell Technology Co., Ltd.
High Repeat Buyers ChoiceFast DeliveryCustomization from Samples
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 5 years CertifiedNearest Port: Tianjin portAverage Response Time: ≤2.16h

About Our Factory & Business Background

Address66 Tiyu North Street, Chang'an District, Shijiazhuang City, Hebei Province
Plant Area216.73 square meters
Number of Employees16
Registered Capital5,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 pcs
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsElectric Vehicle Charger Module, Power Module, AC to DC Converter, DC to DC Converter, Bidirectional Module, DC Fast Charger, EV Charging Station, Liquid Cooling Module, Rectifier Module
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsNo
Test Reports for Raw MaterialsOthers

Our Industry Experience & Global Business Record

Year of Establishment2020-07-06
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, West Asia
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What certifications does the product have?
A:
The products have achieved CE and UL certifications, ensuring they meet European and American standards.
Q:What is the warranty period for the module?
A:
We provide a 12-month warranty for the charging power module.
Q:How is after-sales support provided?
A:
We provide comprehensive technical training, written materials, videos, and face-to-face training. For urgent issues, professional technicians are sent for on-site support.
Q:What are the terms of payment?
A:
Payment terms include T/T in advance or Irrevocable L/C at sight. Other options include LC, D/P, PayPal, and Western Union.
Q:What is the delivery time after order confirmation?
A:
Delivery is typically made within 2-3 weeks after the order is confirmed.

Send Inquiry

*To:Shijiazhuang Maxwell Technology Co., Ltd.Shijiazhuang Maxwell Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

60kw 1000V AC-DC EV Charging Module for Fast DC Chargers
Made-in-China.com
40kw EV Charging Module for DC Fast Electric Car Charger
Made-in-China.com
30kw 1000V AC/DC EV Fast Charging Station Power Module
Made-in-China.com