SourcingAI
Try for free
Powered by Made-in-China.com
Low Voltage&High Current EV Charging Power Module 20kw@120V
US$550.00
1 Piece
Sample price:US$720.00/piece.Request sample

Product profile

Customization

Available

Power Supply

3phase+PE

Communication Mode

Can Bus

Model NO.

MXR100200B

Input Voltage

285VAC-475VAC

Input Current

<40A

Certification

ISO, TUV, RoHS

Output Current

0-200A

Parallel Quantity

Max Number Is 60

Product Name

EV DC Charging Module

Type

Fast EV Charging Station

Warranty

12 Months

Transport Package

by Wooden Carton or Kraft Carton, by Air or by Sea

Specification

459*218*84mm

Trademark

Maxwell

Origin

Hebei

HS Code

8504409999

Production Capacity

10, 000/PCS Per Month

Key features

High Efficiency & Power Factor: Active PFC achieves 0.99 power factor with high efficiency and low standby power consumption.
Wide Output Voltage Range: Supports 40Vdc-100Vdc output voltage with 0-200A continuously adjustable current.
High Reliability Design: Features ultra-high full-load operating temperature resistance and good EMC performance.
Comprehensive Protection: Includes over/under voltage, surge, over-current, and short-circuit protection on input and output.
Compact Dimensions: Small form factor measuring 85mm(H)*218mm(W)*459mm(D) for easy integration.
Parallel Capability: Supports up to 60 units in parallel for scalable charging station deployments.
Global Standard Compliance: Complies with CCS, CHAdeMO, and GB/T standards with ISO, TUV, and RoHS certifications.
Flexible Customization: Offers OEM/ODM services including customization from samples, designs, and minor adjustments.

Company profile

Shijiazhuang Maxwell Technology Co., Ltd.
High Repeat Buyers ChoiceFast DeliveryCustomization from Samples
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 5 years CertifiedNearest Port: Tianjin portAverage Response Time: ≤1.60h

About Our Factory & Business Background

Address66 Tiyu North Street, Chang'an District, Shijiazhuang City, Hebei Province
Plant Area216.73 square meters
Number of Employees16
Registered Capital5,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 pcs
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsElectric Vehicle Charger Module, Power Module, AC to DC Converter, DC to DC Converter, Bidirectional Module, DC Fast Charger, EV Charging Station, Liquid Cooling Module, Rectifier Module
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsNo
Test Reports for Raw MaterialsOthers

Our Industry Experience & Global Business Record

Year of Establishment2020-07-06
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, West Asia
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the warranty period for this module?
A:
We provide a 12-month warranty for this EV DC charging power module.
Q:What are the input and output specifications?
A:
Input is 285Vac-475Vac (3-phase+PE) with <40A current. Output is 40Vdc-100Vdc with 0-200A continuously adjustable current.
Q:How do you provide after-sales support?
A:
We offer technical training via materials, videos, or face-to-face sessions. For urgent issues, we send professional technicians for on-site support.
Q:What is the delivery time after order confirmation?
A:
Delivery is typically made within 2-3 weeks after the order is confirmed.
Q:What are your terms of payment?
A:
We accept T/T in advance or Irrevocable L/C at sight.

Send Inquiry

*To:Shijiazhuang Maxwell Technology Co., Ltd.Shijiazhuang Maxwell Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like