SourcingAI
Try for free
Powered by Made-in-China.com
Stone Coated Metal Roof Tiles Spanish Design
US$2.85
1,000-1,999 piece
US$2.82
2,000-4,999 piece
US$2.75
5,000-9,999 piece
US$2.70
10,000+ piece

Product profile

Customization

Available

After-sales Service

Online Installation Support

Warranty

15 Years

Model NO.

Spanish

Material

Metal

Type

Bent Tiles

Shape

Arched

Size

1340*420mm

Color

Customized

Customized

Customized

Surface Treatment

Stone Chips Coating

Style

Spanhish Tile

Tiles Size

1340mm*420mm

Exposure Size

Exposure Size

Product Color

Customized

Product Thickness

Customized

Production Time

Within 20 Days

Product Package

Plywood Wooden Cases

Product Origin

China

Transport Package

Pallet+Hardpaper Cover+Plastic Wrapping

Specification

1.4*1*1.1m3

Trademark

SKW

Origin

Shandong

HS Code

73089000

Production Capacity

3000PCS/Day

Key features

Customized Color Options: Product color is fully customizable to meet specific design requirements.
Durable Stone Chips Coating: Surface treatment features stone chips coating for enhanced aesthetics and protection.
Exceptional Weather Resistance: Resists wind, earthquakes, fire, storms, hail, and strong winds effectively.
Lightweight Design: Reduces structural load and allows for easy, quick installation.
Superior Waterproofing: Prevents water penetration and safeguards against roof leaks.
Eco-Friendly Material: Recyclable metal material reduces resource waste and maintenance frequency.
Multiple Thickness Options: Available in 0.3mm to 0.5mm thickness to suit various needs.
Fast Production Time: Production completed within 20 days for efficient delivery.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service AvailableExport Year: 2019-09-24 CertifiedNearest Port: Qingdao Port, Tianjin PortAverage Response Time: ≤9.96h CertifiedTerms of Payment: T/T, PayPal

AI-Powered supplier vetting

SummarySKW-related records describe a China-based limited company established in 2019, with 11 employees and operations in Shandong. The supplier reports five production lines, 11–20 quality-control staff, a 3,115.9 m² manufacturing plant, and metal-roof output of 30,000,000 pieces. It offers metal roofing and related building products, reports factories and an R&D/machinery center, and states that it can develop products to customer requirements. Export markets include Africa, Southeast Asia/Middle East, and North America, with exports representing 31%–40% of sales. Lead time is stated as one month in both peak and off-peak periods. However, the records contain inconsistent company names and business classifications, list no management-system certification, and provide only limited customer-transaction evidence.
CertificationsThe supplier management-system certification field is explicitly recorded as “NIL.” No other certification evidence is provided, so certified management-system capability is not demonstrated.
R&D capabilityThe supplier explicitly reports an R&D and machinery center and states that it can design new products according to customer requirements. This is direct evidence of product-development resources.
Production capacityThe supplier reports five production lines, 11–20 quality-control staff, a 3,115.9 m² manufacturing plant, and metal-roof output of 30,000,000 pieces. It also states that it operates production factories and reports one-month lead times in both peak and off-peak seasons, supporting substantial production capability, although the output unit and capacity scope should be validated.
Customization capabilityThe supplier explicitly states that its R&D and machinery center can design new products according to customer requirements and presents itself as offering solutions rather than only standard products. This supports customization capability.

Product Q&A

Q:How can you guarantee quality?
A:
We always produce a pre-production sample before mass production and conduct a final inspection before shipment.
Q:What products can you supply?
A:
We supply prepainted metal roofing, stone coated metal roofing, asphalt shingles, drainage systems, and roofing machines.
Q:Are you a manufacturer?
A:
Yes, we have our own roof factory and roof machine factory with a good reputation in the market.
Q:What is the supply period?
A:
It takes 10-20 days for 1-3 containers of metal roof tiles.
Q:What services can you provide?
A:
We accept delivery terms like FOB, CIF, and EXW, and payment types including T/T, Western Union, and Cash.

Send Inquiry

*To:Skywalker China Co., Ltd.Skywalker China Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like