Powered by Made-in-China.com
Building Construction Painted Pressed Scaffold Scaffolding Formworks Coupler Formwork Steel Rapid Clip Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableFinish
PaintedMaterial
Steel, Metal or SteelModel NO.
SLMType
Formwork AccessoriesName
Formwork Clamp, Pressed Wedge ClampSurface
Galvanized or PaintedDelivery Time
20days-35daysProduct Weight 1
380g, 350g, 400g, 420g, 430gProduct Size
110*75mm, 105*75mm, 105*70mmISO
ISO9001:2015Other Weight
We Can Make According to Your Drawing or SampleOther Size
We Can Make According to Your Drawing or SampleApplication
FormworkCertification
SGS, ISO9001:2015Surface Treatment
Natural or Zinc PlateTechnics
Pressed&Casting&ForgedTransport Package
Wooden Case or Iron Case or PalletSpecification
according to your requestTrademark
SHLOMOrigin
ChinaHS Code
7308400000Production Capacity
10containers/MonthKey features
Customization Available: We can make products according to your drawing or sample for weight and size.
Durable Surface Treatment: Available in Galvanized or Painted finish to prevent rust and ensure longevity.
High Breaking Strength: Features skid-proof design with high breaking strength for safe construction use.
Easy Installation: Designed for easy assembly and dismantling to improve work efficiency.
Strict Quality Control: Teeth hardness tested for every order to ensure strong and reliable performance.
OEM/ODM Service: Professional R&D team designs and manufactures products based on customer ideas and samples.
ISO 9001 Certified: Certified by ISO9001:2015 and SGS for superior quality and reliability.
Fast Delivery: Standard production time is 20-35 days after receiving down payment.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:Can the product be customized?
A:
Yes, customization is available. We can make the weight and size according to your drawing or sample.
Q:What surface treatments are available?
A:
We offer Galvanized or Painted surface treatments to prevent rust.
Q:What is the delivery time?
A:
The standard delivery time is 20-35 days. For full containers, it typically takes 20-30 days after receiving the down payment.
Q:What certifications does the product have?
A:
The product holds ISO9001:2015 and SGS certifications.
Q:Is OEM or ODM service provided?
A:
Yes, we have a strong R&D team capable of designing and making OEM/ODM products according to your ideas, samples, or drawings.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Concrete Column Scaffolding Scaffold Formwork Steel Meva Clamps Manufacturers
US$1.00-15.00
1,000 Pieces(MOQ)
Building Materials Scaffolding Concrete Formwork Panel Wedge Clamp for Construction
US$6.70-6.90
500 Pieces(MOQ)
Construction Formwork Clamp/Scaffolding Clamp/Scaffold Clamp for Peri/Doka/Meva.
US$1.00-15.00
1,000 Pieces(MOQ)
High Strength Galvanized Pressed Steel Scaffold Clamp for Scaffolding System Fittings
US$1.31-1.45
1,000 Pieces(MOQ)
Formwork Scaffolding Steel Panel Clamp for High Quality Construction
US$5.40-5.60
1,000 Pieces(MOQ)
Durable Pressed Steel Pipe Clip Fixing Pressed Double Coupler Scaffolding Swivel Clamp
US$0.50-2.00
200 Pieces(MOQ)
Galvanized Steel Scaffolding Clamp for Pipe Frame Construction Joint Scaffold Clamp Scaffold Coupler
US$1.31-1.45
1,000 Pieces(MOQ)
Formworks Coupler Clip Scaffolding Formwork Steel Rapid Fast Spring Clamps for Construction Formwork
US$0.20-0.50
1,000 Pieces(MOQ)
Best Factory Universal Forged Casting Pressed Steel Swivel Pipe Clamp Fixed Clamps
US$1.00-2.30
500 Pieces(MOQ)
Construction Formwork Scaffolding Steel Rasto Ajustable Splice Rasto Clamp Rasto Aligning Clamp Corner Clamp
US$10.50-10.70
1,000 Pieces(MOQ)
Steel Pipe Fitting En74 Drop Forged Coupler Scaffold Clamp for Scaffolding Tube/Tubular System
US$1.30-1.90
10,000 Pieces(MOQ)
Scaffolding Parts Drop Forged Half Coupler Clamp for Steel Tube Connection
US$1.31-1.45
1,000 Pieces(MOQ)
Oudai OEM Building Scaffolding Formwork Accessories Casting Adjustable Wedge Panel Clamp
US$0.60-1.20
1,000 kg(MOQ)



















