SourcingAI
Try for free
Powered by Made-in-China.com
Building Material Scaffolding/Scaffold Concrete Formwork Panel Wedge Clamp for U. A. E.
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample

Product profile

Customization

Available

Material

Metal or Steel

Type

Formwork Accessories

Name

Column Formwork Clamp

Surface

Galvanized or Painted

Process

Drop Forged, Pressing, Casting

Delivery Time

20days-35days

Certificate

ISO9001:2015

Nature

Manufacturer

Certification

ISO

Application

Formwork

Surface Treatment

Natural or Zinc Plate

Technics

Casting&Forged

Transport Package

Wooden Case or Iron Case or Pallet

Specification

according to your request

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

10containers/Month

Key features

Customizable Surface Treatment: Surface can be Galvanized, Painted, Natural, or Zinc Plate based on customer requirements.
Multiple Manufacturing Processes: Produced via Drop Forging, Pressing, or Casting to meet specific engineering needs.
High Strength Material Options: Constructed from High Strength Metal Material or Steel for durability and load bearing.
ISO9001:2015 Certified Quality: Manufactured under ISO9001:2015 certification with comprehensive quality control systems.
Flexible Packaging Solutions: Available in wooden cases, wooden pallets, metal cases, or customized packaging requests.
European Standard Compliance: All formwork accessories are manufactured strictly according to European standards.
Experienced Manufacturer: Supplier with over 15 years of experience in exporting formwork accessories since 2008.
Comprehensive Testing Plan: Includes chemical, mechanical, ultrasonic, magnetic, radiographic, and hardness testing.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are used for the formwork clamp?
A:
The clamps are made from High Strength Metal Material or Steel.
Q:What surface treatments are available?
A:
Options include Galvanized, Painted, Natural, or Zinc Plate finishes.
Q:What is the typical delivery time?
A:
Delivery time ranges from 20 to 35 days, with off-season lead times within 15 workdays.
Q:Are the products certified?
A:
Yes, we hold ISO9001:2015 certification and comply with European standards.
Q:What packaging methods do you offer?
A:
We use wooden cases, wooden pallets, metal cases, or customize packaging as requested.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like