Powered by Made-in-China.com

Casted/Forged/Pressed Formwork Clamps for Construction Steel Formwork Accessories
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableApplication
FormworkCertification
SGS,ISO9001:2015Model NO.
SLMSurface Treatment
YesTechnics
CastingMaterial
SteelType
Formwork AccessoriesName
Column Formwork ClampSurface
Galvanized or PaintedDelivery Time
20days-35daysISO
ISO9001:2015Product Weight
2.85kgOther Weight
We Can Make According to Your Drawing or SampleOther
OEM Service Is AvailableTransport Package
Wooden CaseSpecification
according to your requestTrademark
SHLOMIOrigin
ChinaHS Code
730840Production Capacity
10containers/MonthKey features
OEM/ODM Customization: We design and make OEM/ODM products according to your ideas, samples, or drawings.
Strict Quality Control: Rigorous control in raw material selection, production line, and pre-packing ensures reliable quality.
Certified Standards: Products are certified with SGS and ISO9001:2015 standards for global compliance.
Wide Application Range: Suitable for wall, slab, column, climbing, slip formwork, and various scaffolding systems.
Competitive Pricing: We insist on superior quality and competitive prices to reach a win-win situation with customers.
Fast Delivery Time: Production takes 20-30 days after down payment; off-season lead time is within 15 workdays.
Galvanized or Painted: Surface treatment options include galvanized or painted finishes for durability.
Global Supplier Experience: Professional supplier since 2008 with over 10 years of experience serving worldwide markets.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the MOQ for this product?
A:
The MOQ is negotiable. Please contact us for specific details based on your order volume.
Q:Can you provide OEM or ODM services?
A:
Yes, we have a strong R&D team that can design and make OEM/ODM products according to your ideas, samples, or drawings.
Q:What is the delivery time for orders?
A:
For full containers, production normally takes 20-30 days after receiving the down payment. Off-season lead time is within 15 workdays.
Q:What certifications do your products have?
A:
Our products are certified with SGS and ISO9001:2015 standards.
Q:What surface treatments are available?
A:
We offer galvanized or painted surface treatments to ensure durability and corrosion resistance.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy Duty Adjustable Concrete Formwork Wedge Steel Scaffolding Clamp for Civil Construction
US$7.60-12.00
5,000 Pieces(MOQ)
Competitive Price for Heavy Duty Galvanized Pressed Construction Concrete Formwork Panel Wedge Beam Clamp
US$7.60-12.00
5,000 Pieces(MOQ)
Uesd for United Arab Emirates Custom Casting Construction Hardware Adjustable Formwork Clamp
US$1.00-15.00
1,000 Pieces(MOQ)
Wall Formwork Accessories Drywall Scaffold Steel Waler Clamp for The European Market
US$1.00-15.00
1,000 Pieces(MOQ)
Galvanized Pressed Construction Concrete Formwork Panel Wedge Clamp for Civil Engineering
US$7.60-12.00
5,000 Pieces(MOQ)
Construction Formwork Clamp - Casting or Forged for Peri/Doka/Meva
US$1.00-15.00
1,000 Pieces(MOQ)
out Corner Locking Clamp of Column Formwork Clamp Shuttering Fastener Accessories for Concrete Construction
US$1.40-3.60
500 Pieces(MOQ)
Durable Pressed Thread Tightening Steel Wedge Formwork Panel Clamp for Scaffolding Use
US$7.60-12.00
5,000 Pieces(MOQ)
Made in China Construction Concrete Steel Wall Formwork Forged Panel Clamps for Peri System
US$9.40-9.60
1,000 Pieces(MOQ)
Hot-DIP Galvanized Plank Clamp 650g Pressed Type for Walkway System Accessories Scaffolding
US$0.643
2,750 Pieces(MOQ)
Formwork Accessories Beam Spring Rapid Clamp for Construction Made in China
US$0.39-0.54
4,000 Pieces(MOQ)
Construction Formwork System Accessories Pressed Rapid Clamp Spring Clamp
US$0.99
100 Pieces(MOQ)
Formwork Accessories Formwork Clamps Casted Formwork Wedge Clamp for Concrete Construction
US$0.69-0.75
2,000 Pieces(MOQ)
Steel Corner Locking Clamp Column Fasterner of Formwork Accessories for Construction Projects
US$1.40-3.60
500 Pieces(MOQ)
Formwork Clamp for Construction Steel Formwork for Peri/Doka/Meva
US$1.00-15.00
1,000 Pieces(MOQ)
High Quality Formwork Metal Scaffolding Universal Clamp for Industrial Construction Accessories
US$0.10-20.00
5,000 Pieces(MOQ)
Construction Formwork Accessories Pressed Clamp Tensioners Formwork Rapid Spring Clamp
US$0.39-0.54
4,000 Pieces(MOQ)
Construction Accessories Formwork Clamps Alignment Clamp Bfd for Peri Formwork Panel Maximo and Trio
US$5.90-6.50
500 Pieces(MOQ)



















