SourcingAI
Try for free
Powered by Made-in-China.com
Concrete Formwork Steel Doka Clamps Manufacturers
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample

Product profile

Customization

Available

Application

Formwork

Certification

ISO

Surface Treatment

Natural or Zinc Plate

Technics

Casting&Forged

Material

Metal or Steel

Type

Formwork Accessories

Name

Column Formwork Clamp

Surface

Galvanized or Painted

Process

Drop Forged, Pressing

Delivery Time

20days-35days

Transport Package

Wooden Case or Iron Case or Pallet

Specification

according to your request

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

10containers/Month

Key features

Customizable Surface Treatment: Surface can be Galvanized, Painted, Natural, or Zinc Plate based on customer request.
High Strength Material Options: Made from Metal or Steel using Casting, Forged, or Pressed techniques.
Flexible Packaging Solutions: Packaging includes wooden case, wooden pallet, metal case, or customized as per customer request.
Comprehensive Quality Control: Full QC system including chemical, mechanical, ultrasonic, magnetic, and radiographic testing.
European Standard Compliance: All formwork accessories are manufactured strictly according to European standards.
Fast Off-Season Delivery: Lead time is within 15 workdays during off-season, ensuring quick turnaround.
Proven Export Experience: Supplying and exporting formwork nuts and accessories since 2008 with high customer satisfaction.
Global Market Reach: Products exported to North America, South America, Europe, Asia, Africa, and Oceania.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are used for the concrete formwork clamp?
A:
The clamps are made from High Strength Metal Material or steel.
Q:What surface treatments are available?
A:
Available options include Natural, Zinc Plate, Galvanized, or Painted surfaces.
Q:What is the delivery time for orders?
A:
Delivery time is 20-35 days generally, or within 15 workdays during the off-season.
Q:How is the product packaged for shipping?
A:
We use wooden cases, wooden pallets, metal cases, or packaging as per customer request.
Q:What quality control tests are performed?
A:
Tests include chemistry spectrum, mechanical properties, ultrasonic, magnetic, radiographic, and hardness tests.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Concrete Formwork Steel Clamp for Peri, Doka, Meva
Made-in-China.com
Peri, Doka, Meva Concrete Formwork Steel Clamp
Made-in-China.com
Concrete Locking Clamp for Peri/ Doka Formwork
Made-in-China.com