Powered by Made-in-China.com

Construction Formwork Tie Rod Water Stopper for Peri/Doka/Meva
US$0.40-2.00
2,000 Pieces
Sample price:US$0.50/piece.Request sample
Product profile
Customization
AvailableApplication
Formwork AccessoriesCertification
ISO, SGSModel NO.
SLMSurface Treatment
Natural, Eg, HDGTechnics
CastingMaterial
Ductile Casted Iron Qt450-10Type
FastenersColour
Self Color (Black), Silver Galvanized or CScaffolding Part Type
Formwork AccessoriesDelivery Time
20 to 30 Days Deponds on QuantityStandard
European, American, Australian StandardsService
OEM Is Available. Samples Are VailableTransport Package
Samll Woven Bag and Ton Bag, Customized Package IsSpecification
0.5/0.55/0.6/0.65/0.7Trademark
SHLOMOrigin
ChinaHS Code
730840Production Capacity
100000PCS/MonthKey features
OEM/ODM Customization: Strong R&D team designs products based on customer ideas, samples, or drawings.
High-Quality Material: Made of Ductile Casted Iron Qt450-10 with strict quality control on raw materials.
Multiple Surface Options: Available in Natural, EG, and HDG surface treatments to meet different needs.
Certified Standards: Products certified by ISO and SGS, meeting European, American, and Australian standards.
Wide Application Scope: Suitable for wall, slab, column, climbing, and slip formwork as well as scaffolding.
Experienced Supplier: Professional supplier since 2008 with over 10 years of industry experience.
Competitive Pricing: Insists on superior quality and competitive prices to ensure customer win-win.
Global Market Reach: Main customers from Europe, Middle East, Australia, America, and South Africa.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the material of the formwork tie rod water stopper?
A:
The material is Ductile Casted Iron Qt450-10, ensuring high strength and durability.
Q:What surface treatments are available?
A:
We offer Natural, EG (Electro-Galvanized), and HDG (Hot-Dip Galvanized) surface treatments.
Q:Can I customize the color or design?
A:
Yes, OEM is available. We can customize colors (Black, Silver Galvanized) and designs based on your samples or drawings.
Q:What is the delivery time for orders?
A:
Delivery time is 20 to 30 days depending on quantity. Peak season lead time is 1-3 months, while off-season is within 15 workdays.
Q:What certifications do your products have?
A:
Our products are certified by ISO and SGS and comply with European, American, and Australian standards.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Construction Formwork Tie Rod Water Stopper for European Market
US$0.40-2.00
2,000 Pieces(MOQ)
Peri/Doka/Meva Construction Steel Formwork Black Water Barrier Stopper
US$0.40-2.00
2,000 Pieces(MOQ)
Formwork Accessories Water Barrier Tie Rod Water Stopper
US$0.45
100 Pieces(MOQ)
Peri/Doka/Meva Formwork Accessories Water Barrier/Water Stopper
US$0.40-2.00
2,000 Pieces(MOQ)
Peri/Doka/Meva Formwork Water Barrier /Water Stop/Water Stopper for Construction
US$0.40-2.00
2,000 Pieces(MOQ)
Cipp Trenchless Inflatable Plug Stoppers for Pipe Blocking
US$146.00-160.00
1 Piece(MOQ)
Trenchless Inflatable Plug Stoppers for Pipe Sealing
US$146.00-160.00
1 Piece(MOQ)
Hand Tool - Door Stopper
US$0.35
2,000 Pieces(MOQ)
Trenchless Tech Inflatable Plug Stoppers for No-Dig Pipe Repair
US$146.00-160.00
1 Piece(MOQ)
Cipp Pre-Repair Inflatable Stopper for Pipe Isolation
US$146.00-160.00
1 Piece(MOQ)
Hand Tool - Door Stoppers
US$0.635
1,200 Pieces(MOQ)
Hand Tool - Door Stoppers Door Knock
US$0.415-0.475
1,200 Pieces(MOQ)
ISO Steel Clip Pin Nails for Using Furred Ceiling by Nail Gun
US$0.10-0.20
10,000 Pieces(MOQ)
Hand Tool - Door Stopper
US$0.915
1,200 Pieces(MOQ)
E300 Special Nail Shooter with Plastic Sleeve Gun Nail Decoration
US$0.10-0.20
10,000 Pieces(MOQ)
Accesorries for Self Drilling Hollow Bar Anchor Soil Nail Micropile Mining
US$3.00-20.00
2,000 Meters(MOQ)
High Speed Flat Head Nail Shooter Nail for Gun Accessories
US$13.00-15.00
500 Tons(MOQ)
Powerful Ceiling Fasteners Nails for Ceiling Gun
US$0.10-0.20
10,000 Pieces(MOQ)
Factory Price Zinc Plating Roof Nails Making Machine Roofing Nails Galvanized Umbrella Head
US$0.001-0.101
1 Piece(MOQ)
Corrosion Resistant Round Head Hanging Nails, Durable Factory Selling with Full Assurance
US$0.50-1.50
1,000 Pieces(MOQ)



















