Powered by Made-in-China.com
EN74-1B Scaffolding Scaffold Formwork Forged Double Right Angle Fix Galvanized Swivel Sleeve Pressed Drop Forged Coupler
US$0.50-2.00
5,000 Pieces
Product profile
Customization
AvailableMaterial
SteelType
Scaffolding CouplerModel NO.
SLMStructural Style
Tower ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
High FormworkErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldProduct Name
Steel Pressed Scaffold Clamp/CouplerSurface
Electro GalvanizedCertificate
ISO9001:2015Thickness
From 2.5mm-5mmTransport Package
Plastic Woven Bags or According to The ClientSpecification
As Clients' RequestTrademark
SHLOMOrigin
ChinaHS Code
73084000Production Capacity
10000 PCS Per DayKey features
Diverse Product Range: Supply swivel, double, sleeve, putlog couplers in German, British, American, Japanese, Australian, Canadian, Italian, and Korean types.
Customizable Thickness: Thickness is customizable from 2.5mm to 5mm to meet specific project requirements.
Professional Manufacturing: Professional manufacturer and supplier of pressed and forged scaffolding couplers with extensive experience since 2008.
Quality Certification: Products are certified under ISO9001:2015 standard ensuring quality management.
Global Market Reach: Main markets include North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, and Western Europe.
Flexible Payment Terms: Accept LC, T/T, Western Union, Small-amount payment, and Money Gram for convenient transactions.
Fast Off-Season Delivery: Off-season lead time is within 15 workdays, ensuring quick turnaround for urgent orders.
Multiple Export Ports: Export via Qingdao and Tianjin ports in China, providing flexible logistics options.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What types of scaffolding couplers do you supply?
A:
We supply many types of pressed and forged scaffolding couplers, including swivel, double, sleeve, and putlog couplers. We also offer German, British, American, Japanese, Australian, Canadian, Italian, and Korean types.
Q:Is the thickness of the coupler customizable?
A:
Yes, the thickness is customizable. We offer thickness options ranging from 2.5mm to 5mm.
Q:What is the surface treatment for the scaffolding couplers?
A:
The surface treatment is Electro Galvanized, providing corrosion resistance and durability.
Q:What is the lead time for orders?
A:
The lead time varies by season. During peak season, it is 1-3 months. During the off-season, the lead time is within 15 workdays.
Q:What payment terms do you accept?
A:
We accept LC, T/T, Western Union, Small-amount payment, and Money Gram.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
En74-1 Bb Standard Forged Steel Double Coupler for Germany Construction Scaffolding Pipes
US$2.00-2.50
5,000 Pieces(MOQ)
48.3mm Forged Steel Right Angle Double Coupler for Brazil Standard Construction
US$1.61-1.68
3,000 Pieces(MOQ)
Easy Scaffold Galvanized BS1139 En74 British Swivel /Fix Scaffolding Coupler
US$1.99
500 Pieces(MOQ)
Scaffolding Coupler Brazil Type Pressed Forged Swivel /Double Coupler En74 BS1139 Standard Coupler
US$1.75-1.85
1,000 Pieces(MOQ)
Drop Forged BS1139 En74 Scaffolding Clamp Pressed Scaffold Coupler Q235 Grade Trinidad
US$1.50
1,000 Pieces(MOQ)
Factory Supply Scaffolding Double Coupler Right Angle Clamp Galvanized Scaffold Fitting
US$0.0025-0.0065
1,000 Pieces(MOQ)
Building Material Scaffolding Clamp - Forged Double Coupler for Formwork Definition Construction
US$5.00-45.00
1 Piece(MOQ)
Steel Plate Pressed Double Coupler/Right Angle Clamp for Tubular Scaffolding for Italy/Italian
US$1.60-4.00
500 Pieces(MOQ)
Steel Double Coupler/Fixed Clamp/Right Angle Coupler for German/Layher Scaffolding System
US$0.65-5.00
1 Piece(MOQ)
48.6mm Pressed Scaffolding Fixed Coupler Right Angle Clamp for Building Scaffold System
US$0.002-0.004
1,000 Pieces(MOQ)
British Type 48.3*60.3mm Scaffolding Right Angle Drop Forged Double Coupler
US$1.83-2.01
100 Pieces(MOQ)
British Type 48.3*60.3mm Scaffolding Right Angle Drop Forged Bolt Coupler
US$1.83-2.01
100 Pieces(MOQ)
Bythai Forged Steel Double Coupler Scaffolding Clamp Meters and Scaffold Clip
US$0.60-1.20
1,000 Pieces(MOQ)



















