Powered by Made-in-China.com
EN74-1B Scaffolding Scaffold Formwork Forged Double Right Angle Fix Galvanized Swivel Sleeve Pressed Drop Forged Coupler
US$0.50-2.00
5,000 Pieces
Product profile
Customization
AvailableMaterial
SteelType
Scaffolding CouplerModel NO.
SLMStructural Style
Tower ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
High FormworkErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldProduct Name
Steel Pressed Scaffold Clamp/CouplerSurface
Electro GalvanizedCertificate
ISO9001:2015Thickness
From 2.5mm-5mmTransport Package
Plastic Woven Bags or According to The ClientSpecification
As Clients' RequestTrademark
SHLOMOrigin
ChinaHS Code
73084000Production Capacity
10000 PCS Per DayKey features
Diverse Product Range: Supply swivel, double, sleeve, putlog couplers in German, British, American, Japanese, Australian, Canadian, Italian, and Korean types.
Customizable Thickness: Thickness is customizable from 2.5mm to 5mm to meet specific project requirements.
Professional Manufacturing: Professional manufacturer and supplier of pressed and forged scaffolding couplers with extensive experience since 2008.
Quality Certification: Products are certified under ISO9001:2015 standard ensuring quality management.
Global Market Reach: Main markets include North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, and Western Europe.
Flexible Payment Terms: Accept LC, T/T, Western Union, Small-amount payment, and Money Gram for convenient transactions.
Fast Off-Season Delivery: Off-season lead time is within 15 workdays, ensuring quick turnaround for urgent orders.
Multiple Export Ports: Export via Qingdao and Tianjin ports in China, providing flexible logistics options.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What types of scaffolding couplers do you supply?
A:
We supply many types of pressed and forged scaffolding couplers, including swivel, double, sleeve, and putlog couplers. We also offer German, British, American, Japanese, Australian, Canadian, Italian, and Korean types.
Q:Is the thickness of the coupler customizable?
A:
Yes, the thickness is customizable. We offer thickness options ranging from 2.5mm to 5mm.
Q:What is the surface treatment for the scaffolding couplers?
A:
The surface treatment is Electro Galvanized, providing corrosion resistance and durability.
Q:What is the lead time for orders?
A:
The lead time varies by season. During peak season, it is 1-3 months. During the off-season, the lead time is within 15 workdays.
Q:What payment terms do you accept?
A:
We accept LC, T/T, Western Union, Small-amount payment, and Money Gram.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffolding Coupler Brazil Type Pressed Forged Swivel /Double Coupler En74 BS1139 Standard Coupler
US$1.75-1.85
1,000 Pieces(MOQ)
American Right Angle Coupler / Scaffolding Double Coupler
US$0.50-2.00
1,000 Pieces(MOQ)
Scaffolding Galvanized Clamp Right Angle Double Coupler
US$0.80-1.50
1,000 Pieces(MOQ)
Scaffolding Forged Double/Right Angle/Fix Coupler
US$0.50-2.00
1,000 Pieces(MOQ)
Scaffolding Coupler En74 Right Angle Clamp
US$2.13-2.43
100 Pieces(MOQ)
Drop Forged Scaffolding Double Swivel Coupler Connecting One 48.3mm Tube and The Other 60.3mm at Any Angle
US$1.96-2.17
100 Pieces(MOQ)
Forged Swivel Scaffolding Fittings Material En74 British Drop Forged Double Coupler
US$0.60-1.20
1,000 Pieces(MOQ)
Hot-DIP Galvanized Scaffolding Double Coupler Right Angle Coupler for 48.3mm Steel Pipe Construction
US$1.00-2.00
1,000 Pieces(MOQ)
Formwork Accessories and Scaffolding Drop Forged Coupler
US$0.65-2.20
1,000 Pieces(MOQ)
Bythai Hot Sale BS 1139 Steel Formwork Forged Scaffolding Clamp Scaffold Beam Clamps Swivel Coupler
US$0.60-1.20
1,000 Pieces(MOQ)
Putlog Coupler En74 BS1139 Forged Scaffolding Half Coupler Clamp Hardware Fitting
US$0.0042-0.0056
5,000 Pieces(MOQ)
Easy Scaffolding Britain Standard En74 Drop Forged Double Swivel Coupler
US$1.28-1.30
40,000 Pieces(MOQ)



















