Powered by Made-in-China.com
Peri/Doka/Meva for Galvanized Formwork Water Stop
US$0.40-2.00
2,000 Pieces
Sample price:US$0.50/piece.Request sample
Product profile
Customization
AvailableApplication
Formwork AccessoriesCertification
ISO, SGSModel NO.
SLMSurface Treatment
Natural, Eg, HDGTechnics
CastingMaterial
Ductile Casted Iron Qt450-10Type
FastenersColour
Self Color (Black), Silver Galvanized or CScaffolding Part Type
Formwork AccessoriesDelivery Time
20 to 30 Days Deponds on QuantityStandard
European, American, Australian StandardsService
OEM Is Available. Samples Are VailableTransport Package
Samll Woven Bag and Ton Bag, Customized Package IsSpecification
0.5/0.55/0.6/0.65/0.7Trademark
SHLOMOrigin
ChinaHS Code
730840Production Capacity
100000PCS/MonthKey features
OEM/ODM Customization: Strong R&D team designs products based on customer ideas, samples, or drawings.
Durable Material: Made of Ductile Casted Iron Qt450-10 with Galvanized or Self Color surface treatment.
Strict Quality Control: Rigorous checks on raw materials, production line, and pre-packing ensure reliability.
Wide Application: Suitable for wall, slab, column, climbing, slip formwork, and various scaffolding systems.
Global Experience: Professional supplier since 2008 with over 10 years of experience serving worldwide.
Fast Delivery: Production takes 20-30 days for full containers after receiving down payment.
Certified Standards: Products comply with ISO, SGS, European, American, and Australian standards.
Competitive Pricing: Offers superior quality at competitive prices to ensure customer win-win situations.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What materials are used for the formwork water stop?
A:
The product is made of Ductile Casted Iron Qt450-10 with surface treatments like Galvanized or Self Color.
Q:Can I customize the color or design?
A:
Yes, OEM is available. We offer colors like Black or Silver Galvanized and can design based on your samples or drawings.
Q:What is the delivery time for orders?
A:
Production typically takes 20 to 30 days after receiving the down payment, depending on the quantity.
Q:What certifications do your products have?
A:
Our products are certified with ISO and SGS and comply with European, American, and Australian standards.
Q:Where are your products mainly applied?
A:
They are widely used in wall, slab, column, climbing, and slip formwork, as well as various scaffolding systems.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
China Factory Peri/Doka/Meva Concrete Formwork Accessories Cast Iron Water Stop for 15/17 Tie Rod
US$0.20-0.50
500 Pieces(MOQ)
Peri/Doka/Meva Concrete Formwork Accessories Cast Iron Water Stop for 15/17 Tie Rod
US$0.40-2.00
2,000 Pieces(MOQ)
Construction Formwork Accessories Tie Rod Water Stop for Peri/Doka/Meva
US$0.40-2.00
2,000 Pieces(MOQ)
Peri/Doka/Meva Formwork Water Stop
US$0.40-2.00
2,000 Pieces(MOQ)
Peri/Doka/Meva Construction Formwork Accessories Tie Rod Water Stop
US$0.40-2.00
2,000 Pieces(MOQ)
Durable Heavy-Duty Waterstop Steel for Reliable Construction Projects
US$3.50-5.50
1,000 Pieces(MOQ)
Sturdy Galvanized Steel Metallic Waterstop for High-Rise Building Basement Joints
US$4.00-12.00
10 Meters(MOQ)
Stainless Steel Board Waterstop for Concrete Joint
US$2.00
100 Meters(MOQ)
Rigid Galvanized Steel Metallic Waterstop for Subway Construction Seams
US$4.00-12.00
10 Meters(MOQ)
Robust Waterstop Steel Designed for Extreme Weather Conditions
US$3.50-5.50
1,000 Pieces(MOQ)
PVC Waterstop Belt for Construction Concrete Cold Joint Waterproofing
US$2.00-20.00
1 Meter(MOQ)
Detachable Waterstop U Type Waterstop for Universal Tunnel Airport Subway Bridge
US$1.80-2.50
100 Meters(MOQ)
Anti-Rust Galvanized Steel Metallic Waterstop for Underground Parking Construction Seams
US$4.00-12.00
10 Meters(MOQ)
Heavy-Duty Steel Waterstop for Effective Water Barrier Solutions
US$3.50-5.50
1,000 Pieces(MOQ)
Heavy-Duty Galvanized Steel Metallic Waterstop for Subway Expansion Joints
US$4.00-12.00
10 Meters(MOQ)
Fflexible PVC Waterstop Strip for Concrete Joint Sealing
US$2.00-20.00
1 Meter(MOQ)



















