Powered by Made-in-China.com

Peri/Doka/Meva Formwork Scaffolding Forged Wing Nut; Anchor Nut; Tie Rod Nut
US$1,000.00-1,500.00
1 Ton
Sample price:US$0.50/piece.Request sample
Product profile
Customization
AvailableMaterial
Ductile Cast IronType
FormworkModel NO.
SLMOther
OEM Service Is AvailableProduct Name
Wing Nut, Tie Rod Nut, Anchor Nut, Formwork Wing NutProduct Weight 1
400g, 450g, 500g, 550g, 580gProduct Weight 2
600g, 630g, 680g, 750g, 920gDiameter
70mm, 80mm, 90mm, 100mm, 110mm, 130mmOther Weight
We Can Make According to Your Drawing or SampleOther Dia
We Can Make According to Your Drawing or SampleISO
ISO9001:2015Application
FormworkCertification
SGS, ISO9001:2015Surface Treatment
Electro GalvanizedTechnics
Casting/CastedTransport Package
Wooden Case or Upon Customer's RequestSpecification
15/17mmTrademark
SHLOMOrigin
ChinaHS Code
7308400000Production Capacity
10container/MonthKey features
OEM/ODM Customization: We design and make OEM/ODM products according to your ideas, samples, or drawings.
High Tensile Strength: Cast iron and forged materials ensure tensile test results greater than 185k.
Electro Galvanized Surface: Zine coated surface treatment provides durability and corrosion resistance.
ISO9001 Certified: Certified by SGS and ISO9001:2015 for superior quality assurance.
Wide Diameter Options: Available in diameters from 70mm to 130mm, including D15 and D20 options.
Professional Supplier: Professional supplier since 2008 with over 10 years of industry experience.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the material of the formwork wing nut?
A:
The material is ductile cast iron, available in cast or forged types.
Q:Can I customize the product size or weight?
A:
Yes, OEM service is available. We can make products according to your drawing, sample, or specific weight and diameter requirements.
Q:What certifications does the product have?
A:
The product is certified with SGS and ISO9001:2015.
Q:What is the surface treatment?
A:
The surface treatment is electro galvanized (zine coated).
Q:What is the production lead time?
A:
For full containers, it normally takes 20-30 days after receiving the down payment. Off-season lead time is within 15 workdays.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Construction Scaffolding Formwork Accessories Galvanized Casted Tie Rod Wing Nut
US$0.58-0.60
3,000 Pieces(MOQ)
Formwork Wing Nut, Scaffolding Wing Nut, Anchor Nut, Tie Rod Nut
US$1,000.00-3,000.00
1 Ton(MOQ)
Factory Price Cast Iron Tie Rod Wing Nut Used for Formwork Scaffolding
US$1,000.00-1,500.00
1 Ton(MOQ)
Formwork/Scaffolding/Scaffold Wing Nut for European Market
US$1,000.00-1,500.00
1 Ton(MOQ)
Scaffolding /Scaffold Formwork Accessoires Tie Rod Hex Nut Cast Iron Wing Nut China Building Materials
US$0.10-0.90
1,000 Pieces(MOQ)
Steel Forged Butterfly Tie Rod 2 Wing Nut Water Stop Feature for Formwork
US$0.58-0.60
3,000 Pieces(MOQ)
Scaffolding Formwork Accessories Anchor Nut 2 Wing Nut for DN15/17 Tie Rod
US$0.98
100 Pieces(MOQ)
Heavy Duty Corrosion-Resistance Zinc Nuts Formwork Forged Tie Rod Threaded Bar 2 Wing Nut Scaffolding
US$0.58-0.60
3,000 Pieces(MOQ)
Scaffolding Forged Anchor Nut Used for Construction
US$2.00-2.05
1,000 Pieces(MOQ)
Heavy Duty Formworks Swivel Wing Nut for 15/17 Tie Rod
US$0.51-1.25
2,000 Pieces(MOQ)
Scaffolding Accessories Two Jaws Three Jaws Butterfly Tie Rod Wing Nut
US$1.30
100 Pieces(MOQ)
Formwork Construction Scaffolding Accessories Square Plate Anchor Wing Nut
US$1.10
100 Pieces(MOQ)
Forged Heavy Duty Formwork Wing Nut for Tie Rod Formwork System
US$0.51-1.25
2,000 Pieces(MOQ)
Tie Rod Formwork Nut Casted Combi Plate Wing Nut for Concrete Construction
US$0.51-1.25
2,000 Pieces(MOQ)
Hardware Building Material Scaffolding Formwork Wing Nut
US$1.00-50.00
500 Pieces(MOQ)
Forged Wing Nut Scaffolding Drop Forged Galvanized Wing Nut for Peri/Doka
US$2.30-2.50
2,000 Pieces(MOQ)



















