SourcingAI
Try for free
Powered by Made-in-China.com
Peri/Doka/Meva/ Steel Formwork Clamp/Bfd Lock with Pressed Process
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample

Product profile

Customization

Available

Application

Formwork

Certification

ISO

Model NO.

SLM

Surface Treatment

Natural or Zinc Plate

Technics

Casting&Forged

Material

Metal or Steel

Type

Formwork Accessories

Name

Column Formwork Clamp

Surface

Galvanized or Painted

Process

Drop Forged, Pressing

Delivery Time

20days-35days

Transport Package

Wooden Case or Iron Case or Pallet

Specification

according to your request

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

10containers/Month

Key features

One-Component Design: Single component ensures flush, aligned, and tight panel connections with no concrete leakage.
Fast Hammer Assembly: Secures panel joints tightly with just one strike of a hammer, ensuring fast and efficient assembly.
Perfect Concrete Finish: Ensures neat panel joints resulting in high-quality, perfect concrete finishes for walls and slabs.
OEM/ODM Capability: Strong R&D team designs and manufactures custom products based on customer ideas, samples, or drawings.
ISO Certified Quality: Products are ISO certified with strict quality control from raw material selection to pre-packing.
Durable Material Options: Made from metal or steel with surface treatments like natural, zinc plate, galvanized, or painted finishes.
Versatile Application: Suitable for wall, slab, column, climbing, and slip formwork, as well as various scaffolding systems.
Fast Delivery Time: Standard delivery takes 20-35 days, with off-season lead times within 15 workdays.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the weight of the BFD alignment clamp?
A:
The BFD alignment clamp weighs 3.6kgs or 4.2kgs depending on the specific model.
Q:How does the BFD clamp ensure joint tightness?
A:
It guarantees strong joints and fast assembly with one single strike of a hammer, preventing any concrete leakage.
Q:Can I customize the product with my own design?
A:
Yes, we offer OEM/ODM services. Our R&D team can design and make products according to your ideas, samples, or drawings.
Q:What are the available surface treatments?
A:
Surface treatments include Natural, Zinc Plate, Galvanized, or Painted options to suit different requirements.
Q:What is the typical delivery time?
A:
Delivery time is generally 20-35 days. Off-season lead time is within 15 workdays, while peak season may take 1-3 months.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Hand Tool - Roller Lock

Hand Tool - Roller Lock

US$0.039-0.049
1,200 Pieces(MOQ)
Made-in-China.com