SourcingAI
Try for free
Powered by Made-in-China.com
Peri/Doka/Meva Steel Formwork Panel Clamp
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample

Product profile

Customization

Available

Application

Formwork

Certification

ISO

Surface Treatment

Natural or Zinc Plate

Technics

Casting&Forged

Material

Metal or Steel

Type

Formwork Accessories

Name

Column Formwork Clamp

Surface

Galvanized or Painted

Process

Drop Forged, Pressing

Delivery Time

20days-35days

Transport Package

Wooden Case or Iron Case or Pallet

Specification

according to your request

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

10containers/Month

Key features

Customization Available: We can customize formwork clamps according to your specific drawings and samples.
High Strength Material: Manufactured from high-strength metal or steel using casting, forging, or pressing techniques.
European Standard Quality: All products are manufactured strictly in accordance with European standards.
Comprehensive Quality Control: Full set of QC systems including chemical analysis, mechanical testing, and dimensional inspection.
Flexible Packaging Options: Available in wooden cases, wooden pallets, metal cases, or customized as per customer request.
ISO Certified: Products meet ISO certification standards for quality and safety.
Long-term Export Experience: Supplying and exporting formwork accessories since 2008 with high customer satisfaction.
Fast Off-Season Delivery: Lead time within 15 workdays during off-peak seasons.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Can the formwork clamp be customized?
A:
Yes, we can customize the formwork clamp according to your specific drawings and samples.
Q:What materials are used for the clamp?
A:
The clamp is made from high-strength metal material or steel.
Q:What is the lead time for delivery?
A:
The delivery time is 20 to 35 days. During peak season, it takes 1-3 months, while off-season lead time is within 15 workdays.
Q:What packaging options are available?
A:
We offer wooden cases, wooden pallets, metal cases, or packaging customized according to customer requests.
Q:Do you have quality control measures?
A:
Yes, we have a full set of quality control systems including raw material control, chemical analysis, mechanical property testing, and various inspection methods.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Peri/Doka/Meva Formwork Wedge Clamp

Peri/Doka/Meva Formwork Wedge Clamp

US$1.00-15.00
1,000 Pieces(MOQ)
Made-in-China.com
Construction Formwork Clamp for Peri/Doka/Meva
Made-in-China.com
Construction Formwork Clamp for Peri, Doka, Meva
Made-in-China.com
Bfd Peri Doka Compatible Formwork Clamp

Bfd Peri Doka Compatible Formwork Clamp

US$6.40-6.50
2,000 Pieces(MOQ)
Made-in-China.com