Powered by Made-in-China.com
Scaffolding Coupler JIS Pressed Double Coupler for Construction/Light Duty Pressed Double Coupler
US$0.50-2.00
5,000 Pieces
Product profile
Customization
AvailableMaterial
SteelType
Scaffolding CouplerSupporting Mode
Projecting ScaffoldingLapping Form
Cross Ring ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Installation ScaffoldProduct Name
Steel Pressed Scaffold Clamp/CouplerSurface
Electro GalvanizedCertificate
ISO9001:2015Thickness
From 2.5mm-5mmTransport Package
Plastic Woven Bags or According to The ClientSpecification
As Clients' RequestTrademark
SHLOMOrigin
ChinaHS Code
73084000Production Capacity
10000 PCS Per DayKey features
OEM Service Available: We provide OEM service for customized product names and specifications.
Multiple Size Options: Available in 48.3mm*48.3mm, 48.3mm*60mm, 48.6mm, and other standard sizes.
Durable Steel Material: Made from high-quality Q235 steel with thickness ranging from 2.5mm to 5mm.
Corrosion Resistant Surface: Surface treated with electro-galvanization or hot-dip galvanization for protection.
ISO9001 Certified: Manufacturing process certified under ISO9001:2015 standards for quality assurance.
Wide Application Range: Suitable for external scaffolding, cross-ring scaffolding, and various construction projects.
Fast Off-Season Delivery: Lead time within 15 workdays during off-season for urgent project needs.
Global Export Experience: Exporting since 2008 to North America, Europe, Asia, Africa, and Oceania markets.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What materials are used for the scaffolding coupler?
A:
The couplers are made from Q235 steel, ensuring high strength and durability for construction use.
Q:What surface treatments are available?
A:
We offer electro-galvanized and hot-dip galvanized surface treatments to prevent rust and corrosion.
Q:Can I customize the product name or specifications?
A:
Yes, we provide OEM services. You can customize the product name, surface treatment, and thickness (2.5mm-5mm).
Q:What sizes are available for the double coupler?
A:
Standard sizes include 48.3mm*48.3mm, 48.3mm*60mm, and 48.6mm. Other sizes can be discussed.
Q:What is the lead time for orders?
A:
During off-season, lead time is within 15 workdays. During peak season, it takes 1-3 months.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Tecon High Quality British Style Construction Scaffold Drop Forged Double Coupler
Negotiable
1,000 Pieces(MOQ)
Premium Electro-Galvanized Half Coupler for Secure Construction Connections
US$0.80-1.50
1,000 Pieces(MOQ)
Heavy Duty Forged Scaffolding Clamp Coupler Industrial Grade for Maintenance & Shutdown Projects
US$1.00-2.00
1,000 Pieces(MOQ)
Heavy-Duty Forged Scaffolding Clamp Scaffold Coupler BS1139 for Safety Standards.
US$0.0425
3,000 Pieces(MOQ)
Premium Drop Forged Scaffolding Swivel Coupler for Construction
US$0.90
10,000 Pieces(MOQ)
Heavy-Duty Swivel Clamp Double Coupler for Scaffolding Systems
US$0.50-2.00
5,000 Pieces(MOQ)
Commercial Use Lightweight Industrial Double Forged Steel Scaffolding Coupler
US$0.80-1.50
1,000 Pieces(MOQ)
Shlomi Pressed Scaffolding Swivel Coupler for Steel Pipe Scaffolding Construction
US$0.50-2.00
5,000 Pieces(MOQ)
China Scaffolding Construction Pressed Fixed Finial Coupler
US$0.53-0.63
100 Pieces(MOQ)
Reliable Heavy-Duty Scaffolding Coupler for Safe Construction Use
US$1.00-1.60
999 Pieces(MOQ)
American Swivel Coupler Forged Scaffolding Tube Clamp American Type Heavy Duty Double Coupler
US$1.17-1.47
500 Pieces(MOQ)
Pressed Swive Coupler /Double Scaffod Coupler/Scaffolding Clamp/Coupler
US$0.50-2.00
5,000 Pieces(MOQ)
Pressed Steel Double Coupler Scaffold Clamp for Secure and Fast Tube Connection
US$660.00-670.00
5 Tons(MOQ)
Commercial Use Lightweight Industrial Double Sleeve En Scaffolding Coupler
US$0.80-1.50
1,000 Pieces(MOQ)
Hebei Factory Pressed JIS Scaffolding Fixed Clamp Swivel Clamp Scaffolding Clamp Coupler
US$0.60-0.90
1,000 Pieces(MOQ)
Commercial Use Lightweight Durable Double Putlog Construction Scaffolding Coupler
US$0.80-1.50
1,000 Pieces(MOQ)



















