SourcingAI
Try for free
Powered by Made-in-China.com
Scaffolding Scaffold Alignment Clamp Bfd for Peri Formwork Panel Maximo and Trio for Construction
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample

Product profile

Customization

Available

Material

Metal or Steel

Type

Formwork Accessories

Model NO.

SLM-Clamp01

Name

Column Formwork Clamp

Surface

Galvanized or Painted

Process

Drop Forged, Pressing

Delivery Time

20days-35days

Certification

ISO

Application

Formwork

Surface Treatment

Natural or Zinc Plate

Technics

Casting&Forged

Transport Package

Wooden Case or Iron Case or Pallet

Specification

according to your request

Trademark

SHLOM

Origin

China

HS Code

730840

Production Capacity

10containers/Month

Key features

Perfect Concrete Finish: Ensures neat panel joints and flush, aligned, tight connections for flawless concrete surfaces.
Fast Single-Strike Assembly: One hammer strike creates tight joints instantly, preventing any concrete leakage during pouring.
Strong Flexural Stiffness: Guarantees robust panel connections that allow large formwork units to be moved safely.
OEM/ODM Customization: Strong R&D team designs custom products based on client ideas, samples, or technical drawings.
Galvanized or Painted Surface: Available in galvanized or painted finishes to ensure durability and corrosion resistance.
ISO Certified Quality: Products meet ISO certification standards with strict quality control from raw material to packing.
Fast Production Delivery: Standard production time is 20-35 days, with off-season lead times within 15 working days.
Global Supplier Experience: Professional supplier since 2008 with over 10 years experience serving markets in Europe and America.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others

About Our Factory & Business Background

AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the weight of the BFD alignment clamp?
A:
The weight varies by model, typically available in 3.6kgs and 4.2kgs options.
Q:Can this clamp be used with Peri Formwork systems?
A:
Yes, it is specifically designed for Peri Formwork Panel Maximo and Trio systems.
Q:What surface treatments are available?
A:
We offer natural, zinc plate (galvanized), or painted surface treatments based on your requirements.
Q:What is the standard delivery time?
A:
Standard delivery is 20-35 days. For full containers, production takes 20-30 days after down payment.
Q:Do you offer OEM or ODM services?
A:
Yes, our R&D team can design and manufacture products according to your samples, drawings, or ideas.

Send Inquiry

*To:Shandong Shlomi Machinery Co., Ltd.Shandong Shlomi Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like