Powered by Made-in-China.com
Scaffolding Scaffold Alignment Clamp Bfd for Peri Formwork Panel Maximo and Trio for Construction
US$1.00-15.00
1,000 Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableMaterial
Metal or SteelType
Formwork AccessoriesModel NO.
SLM-Clamp01Name
Column Formwork ClampSurface
Galvanized or PaintedProcess
Drop Forged, PressingDelivery Time
20days-35daysCertification
ISOApplication
FormworkSurface Treatment
Natural or Zinc PlateTechnics
Casting&ForgedTransport Package
Wooden Case or Iron Case or PalletSpecification
according to your requestTrademark
SHLOMOrigin
ChinaHS Code
730840Production Capacity
10containers/MonthKey features
Perfect Concrete Finish: Ensures neat panel joints and flush, aligned, tight connections for flawless concrete surfaces.
Fast Single-Strike Assembly: One hammer strike creates tight joints instantly, preventing any concrete leakage during pouring.
Strong Flexural Stiffness: Guarantees robust panel connections that allow large formwork units to be moved safely.
OEM/ODM Customization: Strong R&D team designs custom products based on client ideas, samples, or technical drawings.
Galvanized or Painted Surface: Available in galvanized or painted finishes to ensure durability and corrosion resistance.
ISO Certified Quality: Products meet ISO certification standards with strict quality control from raw material to packing.
Fast Production Delivery: Standard production time is 20-35 days, with off-season lead times within 15 working days.
Global Supplier Experience: Professional supplier since 2008 with over 10 years experience serving markets in Europe and America.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2008-08-08Nearest Port: Qingdao,China, Tianjin,ChinaAverage Response Time: ≤24hTerms of Payment: LC, T/T, Western Union, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, Others
About Our Factory & Business Background
AddressNo. 4931 Beihai Road, Weifang, Shandong, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork Accessories, Scaffolding Accessories, Shoring Prop/Steel Prop, Ringlock Scaffolding, Kwikstage Scaffolding, Frame Scaffolding, Swivel Nut/Wing Nut/Anchor Nut, Formwork Steel Clamp, Scaffolding Coupler, Push Pull Prop
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the weight of the BFD alignment clamp?
A:
The weight varies by model, typically available in 3.6kgs and 4.2kgs options.
Q:Can this clamp be used with Peri Formwork systems?
A:
Yes, it is specifically designed for Peri Formwork Panel Maximo and Trio systems.
Q:What surface treatments are available?
A:
We offer natural, zinc plate (galvanized), or painted surface treatments based on your requirements.
Q:What is the standard delivery time?
A:
Standard delivery is 20-35 days. For full containers, production takes 20-30 days after down payment.
Q:Do you offer OEM or ODM services?
A:
Yes, our R&D team can design and manufacture products according to your samples, drawings, or ideas.
Send Inquiry
*To:
Shandong Shlomi Machinery Co., Ltd.
Shandong Shlomi Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Alignment Clamp Bfd for Peri Formwork Panel Maximo and Trio
US$6.40-7.50
1,000 Pieces(MOQ)
Oudai OEM Glavanized Alignment Formwork Clamps for Frame Panels
US$0.60-1.20
1,000 kg(MOQ)
Scaffolding Clamp Formwork Bfd Panel Clamp/Pressed Wedge Clamp Panel Clamp for Beam
US$6.40-6.60
1,000 Pieces(MOQ)
Peri Forged Steel Scaffolding Panel Pressed/Weld Clamp for Formwork Constrcution
US$6.40-7.50
1,000 Pieces(MOQ)
Pressed Scaffolding Clamp Formwork Panel Clamp/Wedge Clamp Panel Clamp for Construction
US$0.40-0.60
1,000 Pieces(MOQ)
Oudai OEM Alignment Clamp for Formwork Shuttering Wall Panel Connection
US$0.60-1.20
1,000 kg(MOQ)
Scaffolding Concrete Formwork Panel Clamp for Construction
US$8.70-8.90
1,000 Pieces(MOQ)
Scaffolding Clamp Peri Doka Clamp/Formwork Bfd Panel Clamp/Pressed Wedge Clamp Panel Clamp for Beam
US$8.50-9.50
50 Pieces(MOQ)
Construction Formwork Clamp/Scaffolding Clamp/Scaffold Clamp for Peri/Doka/Meva.
US$1.00-15.00
1,000 Pieces(MOQ)
Oudai OEM Forged Panel Clamp Scaffolding Formwork Accessories Peri/Doka/Ringer
US$0.60-1.20
1,000 kg(MOQ)
Hot DIP Galvanized Formwork Swivel Scaffold Scaffolding Quick Clamp for Steel Beam and Tie Rod
US$1.31-1.45
1,000 Pieces(MOQ)
Oudai OEM Concrete Wall Formwork Alignment Clamp for Framed Panels
US$0.60-1.20
1,000 kg(MOQ)
Scaffolding Accessories Pressed Bfd Clamp for Peri Formwork with Forged Pin
US$7.80-8.50
10,000 Pieces(MOQ)
Q235 Steel Rapid Scaffolding Scaffold Swivel Clamp for Formwork Tie Rod and Panel Fixing
US$1.31-1.45
1,000 Pieces(MOQ)
Hot DIP Galvanized Wedge Clamp Rapid Swivel Scaffolding Scaffold Clamp for Formwork Panel Connection
US$1.31-1.45
1,000 Pieces(MOQ)



















