Powered by Made-in-China.com
Byd Split EV DC Charger with Intelligent Dynamic Power Distribution and Multiple Charging Dispensers
US$8,503.00-58,077.00
1 Piece
Product profile
Customization
AvailableConnector Type
CCS1, CCS2, CHAdeMO, GB/TInstallation
Floor TypeLocation
Public UseNumber of Charging Interfaces
One Pile with Multiple ChargesStart Mode
Credit Card Payment, Mobile Remote Operation, RFID AuthenticColor
CustomizedAuthentication Method
IC Card or Qr CodePayment
Cash Top-up or APP Online PaymentType
Fast EV Charging StationCertification
CE, ISO, RoHSWarranty
24 MonthsTransport Package
Wooden BoxSpecification
900*880*1950mmTrademark
SGCOrigin
Yangzhou, Jiangsu, ChinaHS Code
8504409999Production Capacity
2000 Pieces/YearKey features
Intelligent Dynamic Power Sharing: Optimally allocates power across sessions to maximize utilization and reduce costs.
Scalable Power Cabinet Options: Available in 240kW to 960kW, supporting up to 10 charging guns per unit.
Global Compatibility Standards: Seamlessly supports CCS1, CCS2, CHAdeMO, and GB/T for international fleets.
OCPP Protocol Compliance: Fully compliant with OCPP 1.6/2.0 for effortless software integration.
Robust Industrial Design: Galvanized steel enclosure with IP55 protection and IK10 impact resistance.
Flexible User Authentication: Supports RFID, QR code, password, and VIN code for versatile access.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2019-05-01Nearest Port: ShanghaiAverage Response Time: ≤2.47hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CIF
AI-Powered supplier vetting
SummaryThe supplier is identified as a professional technical supplier with software development, 3D design, SDK availability, and broad customization capabilities. It holds ISO9001:2015, ISO45001:2018, ISO14001, and CE certifications, and reports documented quality, complaint-handling, corrective-action, and supplier-service procedures. Manufacturing includes two production lines, specified assembly, debugging, wire-stripping, terminal-processing, and waterproof-testing facilities, with stated one-month lead times in both peak and off-peak seasons. Financial records are identified for multiple years, but the slices do not provide sufficient evidence to assess financial strength. The supplier reports cooperation with Fortune 500 companies, although no customer names or project details are provided. A manufacturing control weakness is explicitly reported: ongoing quantity reconciliation for each batch or production volume is not conducted.
Supplier typeThe supplier is explicitly identified as a professional technical supplier. Its stated scope includes production and sales, mechanical and electrical equipment sales, software development, graphic design, and import/export activities.
CertificationsThe supplier reports ISO9001:2015, ISO45001:2018, and ISO14001 management-system certifications, plus CE product compliance certification. These certifications provide explicit evidence of certification coverage in quality, occupational safety, environmental management, and product compliance.
After-Sales capabilityThe supplier has documented and followed procedures for customer complaints and corrective and preventive actions. It also reports written, followed procedures for assessing service capability and maintains an approved service-supplier list, supporting a structured service process.
R&D capabilityThe supplier is identified as a professional technical supplier and reports 3D software design services, software development in its business scope, and SDK availability. These are explicit indicators of technical and software-development capability.
Production capacityThe supplier operates two production lines and lists assembly lines, debugging lines, automatic wire-stripping equipment, terminal machinery, and waterproof-testing equipment. It reports one-month lead times in both peak and off-peak seasons, but explicitly does not conduct ongoing quantity reconciliation for every batch or production volume, indicating a manufacturing-control deficiency.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. This demonstrates broad stated capability across several customization modes.
Client casesThe supplier explicitly reports having collaborated with Fortune 500 companies. No customer names, order scope, product details, or independently verifiable case information are provided, so the evidence supports a positive indication but remains limited in detail.
Product Q&A
Q:How do you ensure the products arrive safely?
A:
Each DC fast charger is protected with shockproof and waterproof packaging, and securely placed inside a customized, sturdy wooden crate for ultimate protection during sea or land freight. We can provide packaging photos before shipment upon request.
Q:What are your payment terms?
A:
Our standard terms are 30% deposit and 70% balance before shipment via T/T.
Q:What is the typical lead time?
A:
The standard production lead time is 25-40 days after order confirmation, depending on the model and quantity. Expedited production can be arranged for urgent projects.
Q:Do you support product customization (OEM/ODM)?
A:
Yes. We offer comprehensive OEM/ODM services, including custom colors, logos, and branding. We can also tailor certain hardware configurations or software interfaces based on your project specifications.
Q:What is your sample policy?
A:
Samples are available for testing. Sample cost and courier freight will be borne by the customer. If a production order follows, the sample cost can often be deducted from the bulk order payment.
Send Inquiry
*To:
Jiangsu Smart Green Charging Technology Co., Ltd.
Jiangsu Smart Green Charging Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Manufacturer Split EV DC Charger with Dispenser for Electric Vehicle Commercial Use with Power Output up to 960kw
US$11,000.00-49,000.00
1 Piece(MOQ)
Manufacturer CCS2 Gbt 600kw 720kw Split Electric Car EV DC Charger with Dynamic Load Balancing
US$13,112.00-49,668.00
1 Piece(MOQ)
Premium 360kw CCS2 Split DC EV Charging Station Charger with High-Efficiency Power Cabinet and Terminals
US$11,900.00-32,850.00
1 Piece(MOQ)
Commercial Use CCS/Gbt Split Fast DC EV Charger Electric Car/Vehicle/Battery Charging Station with Ocpp and CE/TUV
US$18,800.00-48,800.00
1 Piece(MOQ)
Factory 600kw 720kw Distributed Charging Solution DC EV Charger with Integrated Power Cabinet and Terminals Ocpp1.6
US$38,718.00-58,077.00
1 Piece(MOQ)
600kw Horizontal Split-Type DC Fast Charging Station, Flexible Dynamic Power Allocation Commercial EV Charger
US$52,000.00-58,000.00
1 Piece(MOQ)
Evego 40kw Charger EV DC Fast 40kw-240kw Floor Charging Pile with Dynamic Power Sharing Function
US$3,971.00-4,633.00
1 Piece(MOQ)
New 160kw DC EV Charger with Dual Gun and 120kw Power Output
US$4,736.50
1 Piece(MOQ)
Beny 180kw Commercial Split EV Charger Floor-Mounted Multi Guns DC EV Car Charging Stations with Cabinet and Charging Terminal
US$15,618.00-15,818.00
1 Piece(MOQ)
Two Cabinet Dimension Design DC EV Charger Separate Size for 30/40kw and High-Performance 60kw Power Version
US$6,450.00-7,100.00
1 Piece(MOQ)
Compact 40kw DC Fast Charger for Urban Retail with Dynamic Power Distribution
US$2,100.00-6,500.00
1 Piece(MOQ)
20kw 30kw 40kw 150A CCS Gbt DC Byd Rapid Electric Car EV Charger with POS Integration and RFID Card Payment
US$950.00-2,900.00
1 pieces(MOQ)
1200/1440kw Split DC Fast EV Charger, 16 Guns Flexible Power Allocation, Commercial High Power Charging Station
US$42,000.00-45,000.00
1 Piece(MOQ)
DC EV Fast Byd Charger for House and Villa with Peak Demand Management and Load Shedding
US$950.00-2,900.00
1 pieces(MOQ)
480kw Modular DC Split-Type EV Charging Station with 6 Terminals 12 Connectors Intelligent Power Sharing Fast Charger
US$23,000.00-28,000.00
1 Piece(MOQ)
20~60kw CCS Gbt Nacs DC EV Fast Byd Charger for Family Use and Retail Plaza with Ocpp Backend Network Integration
US$950.00-2,900.00
1 pieces(MOQ)



















