SourcingAI
Try for free
Powered by Made-in-China.com
Automatic Bottled Mineral Water Production Line
US$12,500.00
1 Piece

Product profile

Customization

Available

After-sales Service

Remote After-Sales Service, Answering Questions on

Warranty

One Year

Model NO.

CGF SERIES

Type

Piston Filling Machine

Automatic Grade

Automatic

Material Type

Liquid

Filling Valve Head

Multi-Head

Feed Cylinder Structure

Single-Room Feeding

Filling Principle

Atmospheric Pressure

Structure

Rotary

Packaging

Bottle

Packaging Material

Plastic

After-Sales Service Provided

Engineers Available to Service Machinery Overseas

Bottle Type

Pet Plastic Bottle

Material

SUS304

Filling Volume

200ml-2000ml

Control

PLC+ Touch Screen

Transport Package

Wooden Case Packages

Specification

2250*1650*2100mm

Trademark

Sokos

Origin

China

HS Code

8422309010

Production Capacity

8 Sets Per Month

Key features

High Production Capacity: Output ranges from 2,500 to 24,000 bottles per hour for 500ml PET bottles.
3-in-1 Integrated Function: Combines washing, filling, and capping in a single automatic unit.
Flexible Bottle Compatibility: Accommodates PET circular or square bottles with diameters 50-115mm and heights 160-320mm.
Advanced Control System: Equipped with PLC and Touch Screen for precise operation and monitoring.
Stable Filling Performance: Uses downhead cam structure with plunger valves and igus plastic bearings for stability.
Comprehensive After-Sales Support: Includes 12-month warranty, remote support, and optional overseas engineer installation.
Customization Capabilities: Offers full customization, minor customization, and customization from samples or designs.
Proven Manufacturer Experience: Over 25 years of industry experience with 5,000 sqm modern workshop and QC team.

Company profile

Zhangjiagang Sokos Machinery Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceODM ServicesQuality Assurance
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.94h

About Our Factory & Business Background

AddressA17, Jinfeng Technology Pioneer Park, Jinfeng Town, Zhangjiagang City, Suzhou, Jiangsu, China
Plant Area160 square meters
Number of Employees12
Registered Capital1,000,000 RMB
Terms of PaymentLC, D/P, T/T, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners6

Our Production Capability & Technical Expertise

Main ProductsWater Filling Machine, None Gas Drink Filling Machine, Soft Drink Filling Machine, Bottle Blowing Machine
Production Lines2
Production MachinesCutting Facility, Bending Facility, Auto Cutting Facility, Auto Lathing Facility, Drilling Facility
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2016-11-09
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or a trading company?
A:
We are the source factory with 25 years' manufacturing experience in beverage machinery. Located in Jinfeng Town, Zhangjiagang City, Jiangsu Province, China. The transportation is convenient, very close to Pudong Airport and Sunan Shuofang Airport. If your itinerary includes a factory visit, we will pick you up.
Q:How long is your delivery cycle after you order the machinery?
A:
Generally it is 40 working days.
Q:Do you have a relevant after-sales system?
A:
We have a Perfect after-sales system. 1: 12 months warranty. 2: Many-to-one service,we will solve basic problems through telephone and video calls. The operating manual will be sent with the machine or via email. 3: If conditions permit, the engineer will go to the buyer's factory to install and test the machine, and train the buyer's staff on how to operate and maintain the machine.
Q:If I want to buy a machine, what information do I need to tell you?
A:
1: What liquid do you want to fill? 2: What is the capacity and height of the bottle? 3: What is the output in one hour? 4: Related water quality analysis reports, etc. 5: Required mechanical voltage
Q:How do you ensure the quality of the machine?
A:
1:To ensure the accuracy of parts. We are equipped with a variety of professional processing equipment, plus professional processing methods accumulated over the years. 2:Before the machine is assembled, each part is inspected by the inspector. 3:Assemble machines, all with masters with more than 5 years of work experience to operate. 4:After all the equipment is completed, we will connect all the machines and allow at least 12 hours for a complete production line. To test its stability

Send Inquiry

*To:Zhangjiagang Sokos Machinery Co., Ltd.Zhangjiagang Sokos Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like