Powered by Made-in-China.com

Wholesale Supply Energy Efficient High Efficiency Sauer 45 Axial Piston Pump for Mining Equipment and Machine Tools
US$1,350.00
1-9 Pieces
US$1,150.00
10-49 Pieces
US$950.00
50-99 Pieces
US$550.00
100-999 Pieces
US$175.00
1,000+ Pieces
Sample price:US$1200.00/piece.Request sample
Product profile
Customization
AvailableType
Gear, Hydraulic Piston, Vane, High Pressure, etc.OEM
SupportPrice
ReasonableColor
Customized ColorSize
Customized SizeBrand Design
SupportTransport Package
Wooden BoxSpecification
Customized & Standard Spec.Trademark
tell me your aim parts, then get a fast quote.Origin
ChinaProduction Capacity
100, 000 Units/YearCompany profile
Business Type: Manufacturer/Factory CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Shanghai Port CertifiedTerms of Payment: LC, T/T, D/P, etc. CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW
About Our Factory & Business Background
Address282-1810, Changjiang North Road, Jiangxi Street, Xinwu District, Wuxi City
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners200
Our Production Capability & Technical Expertise
Main ProductsSolenoid Valve, Hydraulic Cylinder, Pneumatic Cylinder, Gate Valve
R&D Engineers1 people
Our Industry Experience & Global Business Record
Main MarketsEurope, Southeast Asia/ Mideast, Africa
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Product Q&A
Q:Is the product customizable?
A:
Yes, we offer customized size and color options to suit your specific needs.
Q:What is the warranty period?
A:
We provide a one-year warranty for this hydraulic pump assembly.
Q:What material is the pump body made of?
A:
The pump body is made of high-quality cast iron for durability.
Q:What is the lead time for orders?
A:
Peak season lead time is within 15 workdays, while off-season is one month.
Q:Where are you located?
A:
We are located in Wuxi, Jiangsu, China.
Send Inquiry
*To:
Sunshinepower (Wuxi) Co., Ltd
Sunshinepower (Wuxi) Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Project Supply Energy Efficient High Efficiency Parker Double Hydraulic Pump for Mining Equipment and Machine Tools
US$175.00-1,350.00
1 Piece(MOQ)
Pvm Series with High Efficiency and Low Heat Emission for Energy Conservation Hydraulic Piston Pump
US$50.00-135.00
2 Pieces(MOQ)
Wholesale Supply High Efficiency Leak Resistant Low Pulsation Xlf High Pressure Hydraulic Pump for Marine Equipment
US$175.00-1,350.00
1 Piece(MOQ)
Bulk Supply Energy Efficient High Pressure Hawe Radial Piston Pump for Machine Tools Together with Mobile Machinery
US$175.00-1,350.00
1 Piece(MOQ)
OEM Energy Efficient High Pressure Sauer 90r Hydraulic Piston Pump for Mining Equipment Together with Machine Tools
US$175.00-1,350.00
1 Piece(MOQ)
Open Plunger Pump Erl130 Erl100 83009892 Axial High-Pressure Piston Pump Sauer Dan Foss 45 Series
US$2,125.00-2,153.00
2 pieces(MOQ)
Sauer Dan Foss High Efficiency Hydraulic Variable Piston Pump H1p089 H1p100
US$500.00
5 pieces(MOQ)
Sauer 45 F74b High Pressure Axial Piston Pump for Dump Truck and Paver
US$300.00-1,500.00
1 Piece(MOQ)
Energy Saving Variable Displacement Axial Piston Pump with Excellent Volumetric Efficiency
US$300.00-500.00
2 Pieces(MOQ)
Minimal Internal Leakage High Efficiency Axial Piston Pump for Energy Savings
US$300.00-500.00
2 Pieces(MOQ)
High-Efficiency K5V200DTH Hydraulic Axial Piston Pump for Excavators
US$2,090.00-2,100.00
1 Piece(MOQ)
High-Efficiency Axial Piston Pump for 8-9 Ton Excavators
US$1,256.00-1,456.00
1 Piece(MOQ)
High Quality Rexroth Axial Piston Variable Pump A4csg Series 3X Hydraulic Piston Pump High Efficiency Popular
US$2,000.00-2,500.00
1 Piece(MOQ)
Sauer 45 L30d Compact Hydraulic Axial Piston Pump for Mobile Equipment
US$300.00-1,500.00
1 Piece(MOQ)
Energy-Saving and Fuel-Efficient Open Pump S45 Series J Hydraulic Pump for Construction Site Equipment
US$835.00-1,050.00
1 Piece(MOQ)
High-Efficiency K3V180DTH-9C Axial Piston Gear Pump for hyundai 375-7/385
US$1,900.00-1,920.00
1 Piece(MOQ)



















