SourcingAI
Try for free
Powered by Made-in-China.com
Heavy Duty Carbon Galvanized Steel Construction Scaffolding Water Well Drilling Casing Pipe
US$2,000.00
1 Ton
Sample price:US$10.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

1 Year

Model NO.

STAINLESS STEEL PIPE

Od

3.18~610 mm

Wall Thickness

0.89~60 mm

Max Length

0~50 Mtr

Tolerance Standard

According to ASTM A312, ASTM A213, ASTM A269, etc

Length

1m/2m/6m/12m/as Require

Fix Length

1m/6m/12m

Certificate

GOST PED by TUV ISO 9001,Ts Norsok

Transport Package

with Plastic Caps on Both End, Pack Into Bundle

Specification

1/8"~24"; SCH5~SCHXXS

Trademark

SL or can be customized

Origin

China

HS Code

7304119000

Production Capacity

5000 Tons Per Month

Key features

Wide Size Range: Outer diameter 6-630mm, wall thickness 1-60mm, length 0.5-30m.
Extensive Material Options: TP304/304L/316L, Duplex, Nickel Alloys, and more available.
Multiple Surface Treatments: Pickling, No.1, 2b, Polish, Hairline, Sandblasting options.
Comprehensive Certifications: ISO9001, PED by TUV, GOST, DNV, NORSOK M650, ABS, LR.
Strict Quality Control: 100% PMI tested, ultrasonic flaw detection, eddy current testing.
Flexible MOQ: MOQ is 1 piece; samples can be provided upon request.
Fast Delivery: In-stock items ship in 3-7 days; customized orders in 25-30 days.
Professional Manufacturer: Factory with 20 production lines and Class A1 Pressure Piping License.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2012-04-05Nearest Port: Ningbo, Shanghai, WenzhouAverage Response Time: ≤0.69hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF

About Our Factory & Business Background

AddressNo. 7, Weiyi East 1st Road, Haibin Street, Wenzhou, Zhejiang, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsStainless Steel Pipe, Stainless Steel Seamless Pipe, Welded Stainless Steel Pipe, Sanitary Stainless Steel Pipe, Heat Exchanger Tube, Stainless Steel Seamless Tubing, Stainless Steel Tubing, High Purity Clean Pipe, Welded Stainless Steel Tube, Ss Pipe

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a factory or a trading company?
A:
We are a factory manufacturing seamless stainless steel pipes. We also provide welded stainless steel pipes and pipe fittings. We only deliver pipes that pass our inspection.
Q:Can you provide samples?
A:
Sure! Please specify the material and dimensions, and provide your address. We will send the samples promptly. Shipping is on you, but can be deducted from your order.
Q:What is your delivery time?
A:
Around 25 days (1*40FT as usual) to produce. For in-stock items, the shortest time is 3 days. We will deliver promptly.
Q:What are your payment terms?
A:
Our usual payment term is 30% deposit and the rest against B/L. L/C is also acceptable. Shipping terms are EXW, FOB, CFR, CIF.
Q:How do you guarantee the quality of my goods?
A:
All materials are 100% PMI tested and measured before shipping. We have 20 production lines, advanced equipment, stable suppliers, and ISO 9001 certification with strict quality inspection.

Send Inquiry

*To:Zhejiang Sailing Steel Industry Co., Ltd.Zhejiang Sailing Steel Industry Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Heavy Duty PVC-C Solid Wall Pipe Production Machine Sj-65

Heavy Duty PVC-C Solid Wall Pipe Production Machine Sj-65

US$70,000.00-150,000.00
300 Pieces(MOQ)
Made-in-China.com