SourcingAI
Try for free
Powered by Made-in-China.com
Stordworks Drying All Kinds of Food Processing Tube Bundle Dryer with CE Certification
US$100,000.00
1 Set
Sample price:US$120000.00/set.Request sample

Product profile

Customization

Available

After-sales Service

Support Online

Warranty

1 Year

Movement Way

Agitation

Atomization

Rotary Atomization

Flow

Parallel Flow

Heating Mode

Radioactive

Material Status

Powder

Drying Medium

Superheated Steam

Operation Pressure

Atmospheric Pressure

Operational Method

Continuous

Voltage

220/380/440/as Per Design

Power

90kw

Dimension(L*W*H)

as Per Design

Construction Material

Carbon Steel or Stainless Steel

Motor Brand

ABB /Siemens/China Top Brand

Heating Source

Steam

Evaporation Capacity

400 Kg/H

Heating Area

50 M2

Steam Pressure

<=1.0 MPa

Steam Temperature

<=185

Transport Package

Standard Export Package

Specification

as per requirement

Trademark

Stordworks

Origin

Jiangsu. China

Production Capacity

30sets Per Year

Key features

Indirect Steam Drying: No pollution to product using indirect steam and sweep ambient air.
High Energy Efficiency: Optimizes energy recovery up to 67% with low steam consumption.
Safe Process Design: Minimized oxygen content ensures lowest explosion and fire risk.
Gentle Drying: Achieved through low temperatures and contact with heated tubes.
Customizable Design: Voltage, dimensions, and materials can be customized per design.
Wide Application: Suitable for food, chemical, feed, and fertilizer industries.
Multiple Certifications: CE, ISO9001, ISO14001, ASME, and ATEX design available.
Low Installation Cost: Modular design and pre-manufacturing reduce installation costs.

Company profile

Jiangsu Stord Works Ltd.
Years of Export ExperienceQuality AssuranceManagement CertificationProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 13 Years CertifiedNearest Port: Shanghai Port, Tianjin PortAverage Response Time: ≤1.32h

About Our Factory & Business Background

AddressFangqiao Industrial Area, Yixing City, Wuxi, Jiangsu, China
Registered Capital35,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month, 1-3 months
Minimum Order Quantity1 Set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsRendering Plant, Fish Meal Plant, Lamella Pump, Screw Conveyor, Crusher, Reactor, Heat Exchanger, Cooler, Disc Dryer, Tube Bundle Dryer
Production Lines1
Production MachinesRolling machine, Hydraulic press, Drilling machine, CNC lathe, Vertical lathe, Welding robot, Plate winding machine, Welding machine, Paint room
QA/QC inspectors2 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers3 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2011-11-22
Main MarketsSouth America, Europe, Domestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001

Product Q&A

Q:What is the warranty period?
A:
We provide a 1-year warranty for the product.
Q:What certifications does the dryer have?
A:
The dryer has CE certification and is also available with ASME, ISO9001, ISO14001, and ATEX design certifications.
Q:Can the machine be customized?
A:
Yes, customization is available for voltage, power, dimensions, construction material, motor brand, and heating source.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:What is the lead time for production?
A:
The lead time is 1-3 months during peak season and 1 month during the off-season.

Send Inquiry

*To:Jiangsu Stord Works Ltd.Jiangsu Stord Works Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Factory Price of Beer Distiller Steam Tube Bundle Dryer
Made-in-China.com