Powered by Made-in-China.com
Drop Forged HDG Finished Scaffolding U Head Jack Construction Site Fitting Scaffold Accessories
US$4.92
859-899 Pieces
US$4.62
900-999 Pieces
US$4.42
1,000+ Pieces
Product specifications
Model
Sample price:US$4.40/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
ProvideWarranty
1 YearModel NO.
Scaffolding Head JackApplication
Machine PartsCertification
ISOSurface Treatment
YesTechnics
ForgedMaterial
SteelType
StandProduct Name
Scaffolding Head JackSurtace Finish
Galvanised, PaintedFeature
High Load-Bearing CapacityConstruction Nature
Building ScaffoldMovement Method
Integral Lifting ScaffoldingErection Location
External ScaffoldingOverlap Form
Full ScaffoldingSupport Method
Floor Type ScaffoldingTransport Package
Standard PackagingSpecification
48*600*5*150*150Trademark
/Origin
ChinaProduction Capacity
50000Key features
High Load-Bearing Capacity: Designed with Q355B low-carbon alloy steel uprights for superior strength.
Customizable Standard: Product standards can be adjusted to meet specific project requirements.
Flexible Customization: Offers full, minor, and design-based customization options for clients.
Durable Surface Finish: Available in galvanised or painted finishes for long-lasting protection.
Fast Lead Time: Production completed within 15 workdays for both peak and off-peak seasons.
1-Year Warranty: Includes a comprehensive 1-year warranty period for peace of mind.
High Production Capacity: Annual output exceeds 100,000 tons to support large-scale construction.
Global Export Experience: Products exported to Turkey, Dubai, Russia, and other international markets.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.61h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the warranty period?
A:
We provide a 1-year warranty for this product.
Q:Can the product be customized?
A:
Yes, we offer full customization, minor customization, and flexible customization from designs.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays, regardless of peak or off-peak seasons.
Q:What are the available surface finishes?
A:
The product is available in Galvanised or Painted finishes.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 5 tons.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Ringlock Scaffolding Accessories U Head Jack with Solid Screw Thread
US$4.42-4.92
859 Pieces(MOQ)
Reliable Load Bearing Scaffolding U Head Jack Scaffold Accessories Made of Premium Q235 Steel
US$4.42-4.92
859 Pieces(MOQ)
Welded Steel Construction Building Accessories with U-Clamp for Construction Site Scaffolding Installations
US$1.31-1.45
1,000 Pieces(MOQ)
Precise Machined Scaffolding U Head Jack Scaffold Accessories in Multistory Building Construction
US$4.42-4.92
859 Pieces(MOQ)
Scaffolding Accessories U Head Jack with Solid Screw Thread
US$4.42-4.92
859 Pieces(MOQ)
Industrial Grade Carbon Steel Construction Building Accessories with U-Clamp for Building Project Scaffolding
US$1.31-1.45
1,000 Pieces(MOQ)
Early Stripping Support Slab Formwork Scaffolding Early Striking Head Jacks Prop Accessories
US$7.70-8.10
500 Pieces(MOQ)
Jack Base U Head Jack Scaffold Accessories
US$5.80-7.00
1,000 Pieces(MOQ)
Forged Swivel Coupler Scaffold Accessories Used in Construction
US$1.00-3.00
1,000 Pieces(MOQ)
Early Form Removal Support Striking Drop Head Steel Prop Accessories for Slab Formwork
US$7.70-8.10
500 Pieces(MOQ)
Early Form Removal Support Striking Drop Head Steel Shuttering Shoring Accessories for Slab Formwork
US$7.70-8.10
500 Pieces(MOQ)
Wall Formwork Accessories for Construction
US$0.02
1 Piece(MOQ)
Heavy Duty Construction Fixing Bracket Steel Connector Accessories for Infrastructure Applications
US$0.115-0.37
200 Pieces(MOQ)



















