Powered by Made-in-China.com

Durable Custom Formwork Solutions for Efficient Construction Projects
US$600.00
1-27 Tons
US$592.00
28+ Tons
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableFinish
GalvanizedMaterial
SteelModel NO.
Scaffolding PartsType
Scaffolding AccessoriesProduct Name
Scaffolding AccessoriesApplication
Decorations, ConstructionsFeature
Cost Effective, No Welding, High Quality,etcKeywords
Scaffolding PartsSample
AvailableTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaKey features
Galvanized Steel Construction: Made of high-quality steel with a galvanized finish for rust-proof durability.
Flexible Customization Options: Offers full, minor, and flexible customization from designs to meet specific needs.
High Production Capacity: Annual production capacity exceeds 100,000 tons to support large-scale projects.
Cost-Effective Design: Features no welding requirements and high quality for cost-effective construction.
Trusted by Major Contractors: Strong supply relationships with China Railway Group and China Communications Construction.
Fast Lead Time: Average lead time within 15 workdays for both peak and off-peak seasons.
Global Export Experience: Products exported to Turkey, Russia, UK, Indonesia, and other international markets.
Strict Quality Control: 3 QA/QC inspectors perform random visual inspections on finished products.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:Is customization available for these scaffolding accessories?
A:
Yes, customization is available. We offer full customization, minor customization, and flexible customization from designs.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 28 tons.
Q:What are the payment terms?
A:
The terms of payment are T/T (Telegraphic Transfer).
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak season and off-season.
Q:What is the material and finish of the product?
A:
The product is made of steel with a galvanized finish, providing rust-proof durability.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Premium Steel Solutions for Versatile Custom Floor and Wall Projects
US$8.50-10.00
1,000 Pieces(MOQ)
Premium Steel Plank Solutions for Custom Floor and Wall Projects
US$8.50-10.00
1,000 Pieces(MOQ)
Economical Scaffolding Plank Systems - Cost-Effective Solution for Small Projects Sell
US$13.00-20.00
100 Pieces(MOQ)
Versatile Scaffolding Prop Solutions for Outdoor Construction Projects
US$6.00-12.00
500 Pieces(MOQ)
Durable Steel Plank Solutions for Affordable Construction Floor Applications
US$8.50-10.00
1,000 Pieces(MOQ)
Innovative Aluminum Formwork Solution with High-Quality Pull Tab Design
US$0.10
1 Piece(MOQ)
Durable Steel Plank Solutions for Affordable Premium Construction Applications
US$8.50-10.00
1,000 Pieces(MOQ)
Premium Kwikstage Scaffolding Solutions for Builders and Contractors
US$4.00-10.00
1,000 Pieces(MOQ)
Economical Scaffolding Plank Systems - Cost-Effective Solution for Small Projects Hot Sale
US$13.00-20.00
100 Pieces(MOQ)
Economical Scaffolding Plank Systems - Cost-Effective Solution for Small Projects Sale
US$13.00-20.00
100 Pieces(MOQ)
European Style Steel Braces Versatile Solutions Modern Construction
US$4.00-10.00
1,000 Pieces(MOQ)
Heavy-Duty Adjustable Steel Prop - Scaffolding Solution for Any Environment
US$6.00-12.00
500 Pieces(MOQ)
Premium Ringlock Scaffolding Solutions for Global Construction Needs
US$5.00
2,000 Pieces(MOQ)
Economical Scaffolding Plank Systems - Cost-Effective Solution for Small Projects
US$13.00-20.00
100 Pieces(MOQ)
Adjustable Height Scaffolding Support: Painted Steel Prop Solutions
US$5.00
100 Pieces(MOQ)
Shoring System for Formwork Construction Pipe Support Steel Prop Scaffolding Prop
US$5.00-15.00
1,000 Pieces(MOQ)
Q235 Galvanized Steel Scaffolding Folding Tripod for Adjustbale Shoring Props Construction
US$9.35-10.89
500 Pieces(MOQ)



















