Powered by Made-in-China.com
Durable Mobile Sleeve Coupler for Enhanced Construction Stability
US$0.629
2,750 Pieces
Sample price:US$5.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
ProwideWarranty
3 YearsModel NO.
couplerMaterial
SteelType
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldRoduct Name
Sleeve CouplerUstomzation
AwalableApplication
Decorations, ConstructionsFeaturw
High Load- Bearing CapacilyTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaHS Code
730840Key features
High Load-Bearing Capacity: Designed with Q235 steel to ensure superior strength and safety for construction sites.
3-Year Warranty Coverage: Comprehensive warranty protection for 3 years on all mechanical components.
Customizable Standard: Product standards can be customized to meet specific project requirements.
Flexible Customization Options: Offers full, minor, and design-based customization for tailored solutions.
Fast Lead Time: Production completed within 15 workdays during both peak and off-peak seasons.
Galvanized Anti-Slip Design: Features durable galvanized coating and anti-slip properties for safety.
Mobile Scaffolding System: Integrated lifting method allows for easy movement and installation.
Global Export Experience: Products exported to Turkey, UK, Russia, Indonesia, and other international markets.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.80h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the warranty period for this scaffolding?
A:
We provide a 3-year warranty for this product.
Q:Can the product standards be customized?
A:
Yes, the standard is customizable to meet your specific needs.
Q:What customization options are available?
A:
We offer full customization, minor customization, flexible customization, and customization from designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:How long is the lead time for production?
A:
The lead time is within 15 workdays for both peak and off-peak seasons.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Scaffold Clamp Forged Sleeve Coupler for Construction Building
US$2.62-2.70
1,000 Pieces(MOQ)
Durable Scaffolding Swivel Coupler for Enhanced Stability and Safety
US$0.87-1.00
1 Piece(MOQ)
Durable Forged Coupler 60&48mm for Scaffolding Systems - Enhanced Stability
US$2.00-2.10
1,000 Pieces(MOQ)
Durable Pressed Sleeve Scaffolding Coupler for Construction Projects
US$1.21-1.25
2,000 Pieces(MOQ)
Premium Scaffold Girder Coupler for Enhanced Construction Stability
US$1.082
2,750 Pieces(MOQ)
Premium Scaffolding Forged Girder Coupler for Enhanced Stability
US$0.80-2.80
500 Pieces(MOQ)
Forged Sleeve Coupler Durable Scaffold Clamp Forged Sleeve Coupler for Construction Building
US$2.30
2,000 Pieces(MOQ)
Durable Sleeve Couplers for Steel Pipe Scaffolding Systems
US$0.629
2,750 Pieces(MOQ)
Hebei Factory Scaffolding Accessories Sleeve Coupler out Joint Coupler for Construction
US$0.60-0.90
1,000 Pieces(MOQ)
Durable Ringlock Scaffolding Coupler for Superior Board Stability
US$660.00-670.00
5 Tons(MOQ)
Premium Scaffold Fixings: Putlog Couplers for Enhanced Stability
US$1.58-1.90
5,000 Pieces(MOQ)
Durable Metal Scaffolding Coupler for Enhanced Structural Support
US$1.00-3.00
500 Pieces(MOQ)
Durable Single Coupler for Scaffolding and Construction Projects
US$1.58-1.90
5,000 Pieces(MOQ)
En74 Scaffolding Sleeve Coupler Durable and Long-Lasting, Suitable for Scaffolding Pipes
US$0.80-1.50
1,000 Pieces(MOQ)
Durable 3mm Pressed Scaffolding Fence Coupler for Secure Construction
US$0.57
3,000 Pieces(MOQ)
Durable Steel Sleeve Coupler for Scaffolding - Best Price Guaranteed
US$1.00
1 Piece(MOQ)
British Couplers Formwork Scaffolding Sleeve Coupler Parts Scaffolding Fixed Couplers for Construction
US$0.80-2.80
500 Pieces(MOQ)
Industrial-Grade Scaffolding Coupler for Enhanced Stability and Safety
US$0.052
3,000 Pieces(MOQ)
Forged Pressed Scaffolding Sleeve Coupler for Construction
US$0.90-1.50
100 Pieces(MOQ)



















