Powered by Made-in-China.com
Durable Steel Pipe Scaffolding Jack with Ringlock Head Design
US$4.92
859-899 Pieces
US$4.62
900-999 Pieces
US$4.42
1,000+ Pieces
Product specifications
Head Jack
Sample price:US$4.40/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
ProvideWarranty
1 YearModel NO.
Scaffolding Head JackApplication
Machine PartsCertification
CE, ISOSurface Treatment
GalvanizedMaterial
SteelWarranty Period
1 YearConstruction Nature
Bulding ScaffoldSupport Method
Floor Type ScaffoldingOverlap Form
Special-Shaped ScaffoldingErection Location
Internal ScaffoldingTechnology
ForgedTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaProduction Capacity
50000Key features
High Intensity & Anti-Corrosion: Features forged 20# steel construction with anti-corrosion galvanized surface treatment.
Online Installation Guidance: Provides professional online guidance to assist with scaffold erection and installation.
Flexible Customization Options: Offers full, minor, and design-based customization for specific project needs.
1-Year Warranty Coverage: Includes a comprehensive 1-year warranty period for product quality assurance.
Welded Connection Form: Utilizes secure welded connection form for stable and durable scaffold assembly.
Fast Production Lead Time: Ensures delivery within 15 workdays for both peak and off-peak seasons.
Large Scale Production Capacity: Annual production capacity exceeds 100,000 tons to meet high demand.
Global Export Experience: Products exported to Turkey, UK, Russia, Indonesia, and other international markets.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.10h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the warranty period for the scaffold head jack?
A:
We provide a 1-year warranty period for this product.
Q:Can the product be customized?
A:
Yes, we offer full customization, minor customization, and customization from designs.
Q:What is the average lead time for delivery?
A:
The average lead time is within 15 workdays, regardless of peak or off-peak seasons.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:What material is used for the head jack?
A:
The head jack is made of 20# Steel with a galvanized surface treatment.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
N Building Material Adjustable Q235 Ringlock Solid Screw Jack Base Jack
US$0.20-0.40
1,000 Pieces(MOQ)
Steel Leveling Jack Screw Base Plate Jack for Scaffolding Construction Fittings
US$0.10-5.00
50 Pieces(MOQ)
Construction Project Construction Building Material Galvanized U Head Jack Base Jack
US$0.20-0.40
1,000 Pieces(MOQ)
Best Quality Solid Base Jack Heavy Duty Available with Self
US$0.50-3.00
500 Pieces(MOQ)
Convenient Construction Low Price Durable Galvanized Scaffolding Custom Adjustable Screw Base Jack
US$0.10-5.00
50 Pieces(MOQ)
Adjustable OEM U Jack Scaffolding Construction Parts Building Scaffold U Head Jack
US$0.10-5.00
50 Pieces(MOQ)
Cipp Point-Repair Pretreatment Jack & Duck Billed Hydraulic Jack for Trenchless Pipe Lining
US$803.00-815.00
1 Piece(MOQ)
OEM Galvanized Scaffolding U Head Jack Base Screw Jack
US$0.10-5.00
50 Pieces(MOQ)
No-Dig Point Repair Pretreatment Jack for Trenchless Pipe Repair
US$803.00-815.00
1 Piece(MOQ)
Durable U-Head Support Jack for Formwork Construction Projects
US$0.10
10,000 Pieces(MOQ)
Point Repair Jacks for Trenchless Point Repairs Repairing Pipe of DN150-600
US$803.00-815.00
1 Piece(MOQ)
Hydraulic Jack Set with High Pressure Pump for Steel Strand
US$199.00-599.00
1 Piece(MOQ)
Heavy-Duty Steel Ringlock Scaffolding Head Jack for Ultimate Safety
US$4.42-4.92
859 Tons(MOQ)
Hydraulic Jack for Trenchless Pipe Deformation Repair
US$803.00-815.00
1 Piece(MOQ)
Durable Hot Galvanized Leveling Head Jack for Scaffolding
US$2.20-3.30
1 Piece(MOQ)
Side Wind Trailer Jack with Foot Plate
US$0.60-1.00
300 Pieces(MOQ)
Scaffold Screw/Base Jacks-Essential Components in Scaffolding Systems
US$5.00
1,000 Pieces(MOQ)
Versatile Portable U-Head Jack for Easy Lifting and Support
US$0.10
10,000 Pieces(MOQ)
Heavy-Duty Steel Pipe Jack for Scaffolding Support and Stability
US$4.42-4.92
859 Pieces(MOQ)



















