Powered by Made-in-China.com
High Precision Scaffolding System Accessories for Easy Installation
US$600.00
1-27 Tons
US$592.00
28+ Tons
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableFinish
GalvanizedMaterial
SteelModel NO.
Scaffolding PartsType
Scaffolding AccessoriesProduct Name
Scaffolding AccessoriesApplication
Decorations, ConstructionsFeature
Cost Effective, No Welding, High Quality,etcKeywords
Scaffolding PartsSample
AvailableTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaKey features
High Precision Scaffolding: Designed for high precision installation in construction and decoration projects.
Galvanized Steel Material: Constructed from durable galvanized steel for long-lasting performance.
No Welding Required: Features a no-welding design for easy and quick installation.
Customization Available: Offers full customization, minor customization, and flexible customization options.
Cost Effective Solution: Provides a cost-effective solution for scaffolding needs.
Fast Lead Time: Peak and off-peak season lead time is within 15 workdays.
Sample Availability: Samples are available for customers to verify quality before bulk order.
Global Export Experience: Products exported to Turkey, Russia, UK, Indonesia, and other countries.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.14h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:What are the payment terms?
A:
We accept T/T as the term of payment.
Q:How long is the lead time?
A:
The lead time is within 15 workdays for both peak and off-peak seasons.
Q:Can the products be customized?
A:
Yes, we offer customization from designs, full customization, minor customization, and flexible customization.
Q:What is the material and finish of the scaffolding?
A:
The material is steel with a galvanized finish.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffolding Accessories Formwork System Casted for China Factory Scaffold Insert
US$0.10-0.30
1,000 Pieces(MOQ)
Versatile Scaffolding Nut Durable Steel Prop Accessories for Adjustable Use
US$1.50
1,000 Pieces(MOQ)
Competitive Price Easy-Assembly Ringlock Ledger Wedge Head System Scaffold Accessories for High-Rise
US$550.00-600.00
5 Tons(MOQ)
Scaffolding/Scaffold Accessories for Ringlock Scaffold Construction Building Material Frame System Sleeve
US$0.80-1.00
2,000 Pieces(MOQ)
Forged Anchor Nut Scaffolding Formwork Accessories for Building Materials
US$2.20-2.40
2,000 Pieces(MOQ)
Widely Used Red Pressed Accessories for Durable Scaffolding Systems
US$0.60-2.70
1 Piece(MOQ)
Versatile Steel Prop Accessories for Durable Scaffolding Prop Plate Options
US$1.50
1,000 Pieces(MOQ)
Premium Quality Steel Prop Accessories for Reliable Scaffolding Parts
US$1.50
1,000 Pieces(MOQ)
JIS Standard B Form Tie Steel Formwork Accessories for Scaffolding
US$0.0125
3,000 Pieces(MOQ)
Hebei Scaffolding Accessories Wholesale Distributor for Inner Joint Pins
US$2.70
1 Piece(MOQ)
Quality Scaffolding Prop Accessories for Reliable Steel Prop Plates
US$0.50-1.50
1,000 Pieces(MOQ)
Easy Scaffolding Galvanized 12mm Formwork Accessories Steel Cone
US$1.99
500 Pieces(MOQ)
Bfd Clamp Peri Clamp Scaffolding Pressed Panel Clamp Formwork Accessories for Building Materials
US$6.70-6.90
1,000 Pieces(MOQ)
Scaffolding Camp/Scaffolding Accessories for Construction Prop Right Angle Scaffold Putiog Hanger
US$9.99-69.99
500 Pieces(MOQ)



















