Powered by Made-in-China.com

Premium Scaffold Components for Safety and Versatile Support Solutions
US$600.00
1-27 Tons
US$592.00
28+ Tons
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableFinish
GalvanizedMaterial
SteelModel NO.
Scaffolding PartsType
Scaffolding AccessoriesProduct Name
Scaffolding AccessoriesApplication
Decorations, ConstructionsFeature
Cost Effective, No Welding, High Quality,etcKeywords
Scaffolding PartsSample
AvailableTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaKey features
Galvanized Steel Construction: Made from high-quality steel with a galvanized finish for durability and corrosion resistance.
High Production Capacity: Annual production capacity exceeds 100,000 tons to support large-scale construction projects.
Flexible Customization: Offers full, minor, and flexible customization options based on client designs and requirements.
Trusted by Major Contractors: Supplies China Railway Group, China Railway Construction, and China Communications Construction.
Cost-Effective Design: Features no welding requirements, ensuring cost efficiency and high quality in scaffolding parts.
Fast Lead Time: Average lead time within 15 workdays for both peak and off-season periods.
Strict Quality Control: 3 QA/QC inspectors perform random visual inspections on finished products.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.10h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:What are the payment terms?
A:
Payment is accepted via T/T (Telegraphic Transfer).
Q:What are the available customization options?
A:
We offer customization from designs, full customization, minor customization, and flexible customization.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak and off-season periods.
Q:What is the material and finish of the scaffolding parts?
A:
The material is steel with a galvanized finish.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Professional Scaffold Components with Expert Solution Design and Technical Support
US$6.60-12.30
1 Piece(MOQ)
Stable Floor Type Scaffolding Components for Temporary Load Bearing and Support Solutions
US$6.60-12.30
1 Piece(MOQ)
Reliable Scaffold Components with Custom Made Prop Sleeve and Nut
US$1.50
1,000 Pieces(MOQ)
Durable Floor Type Scaffolding Components for Temporary and Permanent Support
US$6.60-12.30
1 Piece(MOQ)
High Quality Aluminium Building Scaffolded Systems Construction Scaffolding
US$5.00-9.00
1,000 Pieces(MOQ)
Nternational Standard Material System Steel Ringlock Scaffolding for Sale Building Construction Scaffolding
US$0.50-10.00
1,000 Pieces(MOQ)
Scaffolding Ringlock System Accessories Rosette 48mm Spigot Q235 Layher Round Ring Collar Base
US$2.99-9.99
5,000 Pieces(MOQ)
Durable Anti-Slip Steel Walkway System for Safe Scaffolding Use
US$10.00-20.00
500 Pieces(MOQ)
Scaffolding Ring Lock Cast Steel Round Ring Ledger End
US$0.80-1.00
5,000 Pieces(MOQ)
China Factory Supply Customized Galvanized Scaffolding Platform Metal Steel Plank and Board Scaffolding
US$13.00-20.00
100 Pieces(MOQ)
Heavy-Duty Threaded Scaffolding Parts for Maximum Load Capacity
US$2.50
200 Pieces(MOQ)
Bfd Clamp Scaffolding Formwork Accessories Presssed Q345materials for Clamp
US$6.40-6.60
1,000 Pieces(MOQ)
Construction Concrete Formwork Galvanized/Painted Adjustable Shoring Steel Support Scaffolding Props
US$6.60-12.30
1 Piece(MOQ)
Formwork Construction Hardware Galvanized Scaffolding Props Jack Base China Supplier
US$2.00-2.50
100 Piece(MOQ)
Scaffolding Fittings Carbon Steel Connecting Components for Building Scaffolding Work
US$0.60-1.20
1,000 Pieces(MOQ)



















