Powered by Made-in-China.com
Premium Swivel Ringlock Scaffolding Clamp for Global Distribution
US$670.00
5-49 Tons
US$660.00
50+ Tons
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
GalvanizedModel NO.
Ringlock scaffoldMaterial
SteelType
Scaffold CouplersProduct Name
Ringlock Scaffolding CouplerSurtace Finish
Galvanised, PaintedApplication
Decorations, ConstructionsFeature
High Load-Bearing CapacityAfter-Sales Service
ProvideWarranty Period
1 YearStructural Form
Multi-Pole ScaffoldingArchitectural Approach
Combined ScaffoldingOverlap Form
Full ScaffoldingErection Location
External ScaffoldingMovement Method
Integral Lifting ScaffoldingScaffolding Parts
Scaffold CouplersConstruction Nature
Building ScaffoldSurface Finish
Galvanised, PaintedTransport Package
Standard PackagingSpecification
CustomizableTrademark
/Origin
ChinaKey features
High Load-Bearing Capacity: Designed for heavy-duty construction with robust steel structure.
Customizable Surface Finish: Available in Galvanized or Painted finishes to meet specific needs.
1-Year Warranty Coverage: Comprehensive 1-year warranty period for quality assurance.
Fast Lead Time: Efficient production with lead time within 15 workdays.
Flexible Customization: Supports full, minor, and design-based customization options.
Proven Manufacturer: Annual capacity over 100,000 tons with strong supply chain.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 2 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.14h CertifiedTerms of Payment: T/T
AI-Powered supplier vetting
SummaryHebei Shuangtai Mould and Scaffolding Technology Co., Ltd. is identified as an Asian scaffolding manufacturer offering cup-lock, bowl-lock, plate-type, and disc-type scaffolding. It reports customization capability, available SDK support, CAD-based R&D, inventory capability, and lead times within 15 working days in both peak and off-season periods. However, the investigation identifies substantial documentation and control gaps: no raw-material traceability, finished-product checks performed by packing staff with random inspection, no written service-capability procedures or corrective-action records, no written customer-complaint procedures, and no R&D audit documentation. The supplier has one R&D engineer and three quality inspectors. It has no overseas agents, branches, warehouse, or showroom, and no offline trade-show participation. Financial-capacity indicators are present for 2023–2025, but the slices do not provide sufficient detail to assess financial strength. No certification evidence or...
Supplier typeThe supplier’s stated business scope covers construction-related metal structures, mechanical components, steel products, metal products, building materials, and hardware, while its listed core products are four scaffolding types. The legal name and representative title also identify it as a scaffolding manufacturer.
After-Sales capabilityAfter-sales and service controls appear weakly documented: there are no written customer-complaint procedures or records, no written service-capability assessment or corrective-action procedures, and no overseas agents, branches, warehouse, or showroom. The supplier does report inventory capability and accepts FOB, CIF, and EXW service quotations, but this does not establish effective after-sales support.
R&D capabilityThe supplier reports an available SDK, CAD capability, and one R&D engineer whose responsibilities include adapting product length, thickness, and shape to customer requirements. However, no design-input, output, review, verification, or validation documentation is available for audit, limiting evidence of a mature innovation system.
Customization capabilityThe supplier explicitly reports full, minor, flexible, and design-based customization, and its R&D engineer adjusts product length, thickness, and shape according to customer requirements. CAD is used for R&D, although the absence of auditable design documentation reduces confidence in formal customization control.
Product Q&A
Q:What surface finishes are available?
A:
The scaffolding clamps are available in Galvanized and Painted finishes.
Q:Is customization available?
A:
Yes, customization is available including full, minor, and design-based options.
Q:What is the warranty period?
A:
We provide a 1-year warranty period for our products.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 28 tons.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak and off-season.
Send Inquiry
*To:
Hebei Shuangtai Mould Frame Technology Co., Ltd
Hebei Shuangtai Mould Frame Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Forging Tube Connector Steel Joint Coupler Scaffolding Swivel Clamp for Pipe Connection
US$0.10-2.00
500 Pieces(MOQ)
Double Clamp Scaffolding Coupler Fastener Swivel Scaffold Clamp for Scaffolding Material Construction
US$5.50-8.00
1,000 Pieces(MOQ)
Scaffolding Brazilian Fasteners Forged Swivel Clamp for Scaffolding Accessories
US$1.80-1.82
5,000 Pieces(MOQ)
Premium Formwork Scaffolding Panel Clamp for Superior Construction Performance
US$3.50-3.80
600 Pieces(MOQ)
Scaffolding Coupler, Premium Drop Forged Clamp for Secure Tube Fitting
US$1.10-1.60
1 Piece(MOQ)
Premium Quality Galvanized Scaffold Board Retaining Clamp for Scaffolding Plank Fixing
US$0.56-1.66
1,000 Pieces(MOQ)
Heavy Duty En74 Certified Swivel Scaffolding Clamp for Construction Projects
US$2.50-3.00
1,000 Pieces(MOQ)
48.3mm Forged T Bolt & Nut Half Rosette Clamp for Ringlock Scaffolding System
US$3.30-3.35
2,000 Pieces(MOQ)
Construction Fixed Swivel Galvanized Clamp for Scaffolding Cast Iron Coupler
US$0.10-0.20
10,000 Pieces(MOQ)
Hot DIP Galvanized Drop Forged Ring Lock Rosette Clamp for Scaffolding
US$2.62-3.00
2,000 Pieces(MOQ)
Premium Heavy-Duty Double Clamp Swivel Coupler for Scaffolding
US$6.00
100 Pieces(MOQ)
48mmx60mm Steel Pipe German Forged Scaffolding Tube Swivel Clamp for Building Materials
US$1.30-1.90
10,000 Pieces(MOQ)
32mm/48mm/60mm Scaffolding Swivel Coupler Clamp for Temporary Platform Assembly
US$1.31-1.45
1,000 Pieces(MOQ)
Drop Forged Galvanized Ringlock Scaffolding Rosette Clamp for Vertical Standard or Tube
US$2.62-3.00
2,000 Pieces(MOQ)
Adjustable Right Angle Pipe Coupler Swivel Scaffolding Clamp for Building Tube Fixing Scaffold Clamp
US$1.31-1.45
1,000 Pieces(MOQ)
Scaffolding Forged Swivel Clamp for Brazil Market
US$1.80-1.82
5,000 Pieces(MOQ)
Pressed Steel Swivel Coupler Galvanized Scaffolding Clamp for Building Scaffold Parts
US$0.70-1.30
10 Pieces(MOQ)
Heavy Duty Steel Scaffolding Swivel Coupler Clamp for Flexible Tube and Pipe Connections
US$1.31-1.45
1,000 Pieces(MOQ)



















