SourcingAI
Try for free
Powered by Made-in-China.com
Leading Factory Industrial Storage Sheet Drawer Racking Shelving with Heavy Loading Capacity
US$10.00
200 Pieces

Product profile

Customization

Available

After-sales Service

Installation

Warranty

1 Year

Model NO.

Frame 01

Usage

Tool Rack, Beverage, Clothing, Tools, Supermarket, Food, Industrial, Warehouse Rack

Material

Steel

Structure

Rack

Mobility

Adjustable

Height

0-5m

Closed

Open

Development

New Type

Serviceability

Common Use

Beam

Customizable

Upright

Customizable

Levels

3-10 Levels

Shelf Decking

Flat or Checkered or Perforate Steel Plate

Surface Finish

Powder Coated/ Galvanized

OEM&ODM

Yes

Color

Blue, Orange or Customized: All Ral Color

Transport Package

Package Ends with Cardboard and Bundle with Steel

Trademark

Supper Rack

Origin

China

HS Code

73089099

Key features

Heavy Load Capacity: Single layer bears 5 tons, total set stores 30 tons.
Customizable Structure: Beams, uprights, and levels (3-10) are fully customizable.
Easy Manual Operation: Drawers shake out manually, safe even when fully loaded.
Versatile Surface Finish: Options include powder coated, galvanized, flat, or checkered plates.
OEM & ODM Support: Full customization services including colors and designs.
Multi-Layer Design: 5+1 layers structure for efficient space utilization.

Company profile

Suhong International Trade (Nanjing) Co., Ltd.
High Repeat Buyers ChoiceFull CustomizationQuality AssuranceProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.65h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressRoom 205, South Building, Block A13, Building 32, No. 15 Fengji Avenue, Yuhuatai District, Nanjing City.
Plant Area2881 square meters
International Commercial Terms(Incoterms)FOB, CFR, EXW, CIF
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Pc
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsCustomized Racking, Heavy-Duty Pallet Racking, Drive-in Racking, Cantilever Racking, Mezzanine System, Intelligent Storage System, Drawer-Type Mold Racking, Gravity Flow Racking, Two-Way/Four-Way Radio Shuttle, Storage Shelving
Production MachinesSawing Machine, Drilling Machine, Shearing Machine, Bending Machine, Auto-welding Machine, Rolling Mill Machine, Welding Line, Punching Machine
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsSoutheast Asia/ Mideast
Repeat Buyers Choice50%~80%

Product Q&A

Q:What is the delivery time?
A:
Generally, it will take 10 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q:How can I install the shelf and rack?
A:
It's easy to install the shelf. There are also install videos and pictures for you.
Q:What is the MOQ can order be?
A:
Normally is one 20 ft container. It also depends on the size of your products.
Q:What is the warranty period?
A:
We provide a 1-year warranty for our products.
Q:What after-sales service is provided?
A:
We offer installation service as part of our after-sales support.

Send Inquiry

*To:Suhong International Trade (Nanjing) Co., Ltd.Suhong International Trade (Nanjing) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like