SourcingAI
Try for free
Powered by Made-in-China.com
High Cost Performance BOPP Hot Melt Glue Adhesive Labeling Machine
US$40,000.00-200,000.00
1 Piece

Product profile

Customization

Available

Automatic Grade

Automatic

Application

Cosmetics, Drinks, Cleaning, Detergent, Skin Care Products, Hair Care Products, Oil, Dairy Products

Model NO.

TBO

Type

Hot Melt Adhesive Labeling Machine

Driven Type

Electric

Classification

Hot Melt Glue Labeling Machine

Item

Hot Melt Glue Adhesive OPP Labeling Machine

Label Material

BOPP, OPP

Bottle Shape

Round, Square

Capacity

3, 000~36, 000bph

Warantty

2 Years

Label Size

Customized

Glue

Hot Glue

Spare Parts

1 Set for Free

Installation

Engineers to Client's Factory

Label

Rolled

Transport Package

Seaworthy Wooden Case

Specification

CE, ISO, SGS

Trademark

Sunswell

Origin

China

HS Code

8422309090

Production Capacity

10000bph

Key features

High-Speed Performance: Maximum labeling speed up to 10,000 pcs/H with 100 meters/min label feed.
German Servo Technology: Uses German high-speed servomotors and controllers for precise label feeding.
Customizable Label Size: Label size can be customized to fit various bottle shapes and requirements.
Comprehensive Safety System: Features alarms for lack of label, bottle jam, and temperature inspection.
Two-Year Warranty: Includes a 2-year guarantee covering mechanical defects and maintenance.
Free Spare Parts: Comes with two years worth of easy-to-break spare parts included for free.
Engineer Installation Support: Engineers are sent to client's factory for installation and staff training.
Versatile Application: Suitable for cosmetics, drinks, detergents, and various liquid packaging.

Company profile

Zhangjiagang Sunswell Machinery Co., Ltd.
High Repeat Buyers ChoiceYears of Export ExperienceExhibition Experience
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 15 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤4.75h

AI-Powered supplier vetting

SummarySUNSWELL MACHINERY CO., LTD., located in Zhangjiagang, Asia, specializes in manufacturing various production lines for beverages and edibles. The company is a trade entity with a strong OEM presence for known brands and provides full customization services. It lacks an overseas warehouse and showroom and does not have overseas branches. The supplier maintains quality control processes and is capable of handling customer complaints. However, it does not hold valid contracts with subcontractors. The company has a single quality control inspector and offers services such as participation in trade shows like WORLDFOOD UZBEKISTAN.
Supplier typeSUNSWELL MACHINERY CO., LTD. is a trade company located in Zhangjiagang, Asia, with manufacturing capabilities.
After-Sales capabilityThe supplier has clear procedures for handling customer complaints and offers services with acceptable payment terms.
R&D capabilityThe company has developed new products in the past year but lacks SDK availability.
Production capacityThe supplier has in-stock service capacity but lacks overseas warehousing and associated valid contracts with subcontractors.
Customization capabilitySUNSWELL offers full customization services based on samples and designs.

Product Q&A

Q:Which city are you located in and how can I visit your factory?
A:
We are located in Zhangjiagang city, which is two hours driving from Shanghai. We are a factory, not a trading company.
Q:Why are your prices higher than other suppliers?
A:
We offer high-end machines with advanced technology. We welcome you to visit our factory to see the difference in quality.
Q:What is the delivery time for the machines?
A:
Normally 20-60 working days depending on the machine type. Water machines are faster, while carbonated drink machines take longer.
Q:How do I install the machine and what are the costs involved?
A:
We send engineers to your factory for installation and training. You are responsible for air tickets, accommodation, and the engineer wage of USD100/day/person. Alternatively, you can send your engineers to our factory for training.
Q:How long does the installation process take?
A:
It depends on the machine and your factory's readiness. If everything is prepared, it typically takes about 10 to 25 days.

Send Inquiry

*To:Zhangjiagang Sunswell Machinery Co., Ltd.Zhangjiagang Sunswell Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like