Powered by Made-in-China.com
Spiral Welded Pipe Making Production Line
US$10,000,000.00-15,000,000.00
1 Set
Product profile
Customization
AvailableAutomatic Grade
AutomaticWarranty
1 YearModel NO.
SXHNGKPayment
L/C,T/TDelilvery Time
10 MonthsFob
Tianjin Port, ChinaQuality Warranty
12 MonthsName
Spiral Welded Pipe MillTransport Package
Wood PalletSpecification
MetalTrademark
SXHNGKOrigin
ChinaHS Code
8501109101Production Capacity
5 SetsKey features
Submerged-Arc Welding: Utilizes continuous spiral welding via submerged-arc welding machine for high quality.
Comprehensive Inspection: Includes X-ray, hydraulic, and ultrasonic inspections to ensure pipe quality.
Low Investment Cost: Adopts intermittent production method offering low investment and simple operation.
Automatic Grade: Fully automatic equipment for uncoiling, leveling, forming, and welding processes.
1-Year Warranty: Provides a 1-year quality warranty covering mechanical defects.
Flexible Payment Terms: Accepts L/C, T/T, PayPal, and Western Union for convenient transactions.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-08-01Nearest Port: Tianjin Port,ChinaAverage Response Time: ≤0.52hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
AddressChuangye Training Building, Beizhonghuan Street, Taiyuan, Shanxi, China
Average Lead TimePeak Season Lead Time: 6-12 months Off Season Lead Time: 3-6 months
Our Production Capability & Technical Expertise
Main ProductsWelded Pipe Mill, ERW Pipe Mill, LSAW Pipe Mill, SSAW Pipe Mill, Slitting Line, Cut to Length Line, Pipe Machine, Pipe Making Machine, Seamless Pipe Mill, Tube Mill
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the warranty period for the equipment?
A:
We provide a 1-year warranty for the spiral welded pipe making production line.
Q:What is the typical delivery time?
A:
The average lead time is 3-6 months during the off-season and 6-12 months during the peak season.
Q:What payment methods are accepted?
A:
We accept various payment methods including L/C, T/T, PayPal, and Western Union.
Q:What quality inspection methods are used?
A:
The process includes X-ray inspection, hydraulic testing, and ultrasonic inspection to ensure the quality and integrity of the finished pipes.
Q:Where is the manufacturing base located?
A:
Our factory is located in Taiyuan, Shanxi, China, with exports shipped from Tianjin Port.
Send Inquiry
*To:
Shanxi Haina H-tech Precision Machinery Co., Ltd.
Shanxi Haina H-tech Precision Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced 3200mm Pipe Production Line with 200kw Power Capacity
US$40,000.00-360,000.00
1 Set(MOQ)
A P I Standard Back Swing Spiral Welded Pipe Mill Production Line
US$10,000,000.00-15,000,000.00
1 Piece(MOQ)
1850-2200MPa Oil Tempering Spring Wire Production Line for Making Cold Coiling Suspension Springs
US$150,000.00-200,000.00
1 Set(MOQ)
Hot Sale High Quality Full Automatic Paint Frame Forming and Installing Plastic Grip Production Line with CNC Controller
US$10,000.00-11,000.00
1 Piece(MOQ)
Forward Swing Spiral Weld Tube Mill/Line for Factory Production
US$10,000,000.00-15,000,000.00
1 Piece(MOQ)
Lrpc Strand Production Line
US$150,000.00-400,000.00
1 Piece(MOQ)
CO2 MIG Welding Wire Pant Setup Manufacturer Er70s-6 Making Machines Production Line
US$377,000.00-426,000.00
1 Piece(MOQ)
Steel Iron Wire Cloth Coat Hanger Making Production Line
US$3,000.00-4,500.00
1 Piece(MOQ)
High Efficiency Carbon Steel /Stainless Steel/ ERW Tube High Frequency Seamless Pipe Welding Pipe Making Machinery Mill Line Tube Mill Line
US$1,000,000.00-1,500,000.00
1 Set(MOQ)
Insulating Glass Aluminum Spacer Bar Production Line for Glass Aluminum Spacer Bar
US$53,000.00-55,000.00
1 Piece(MOQ)
Factory Price High Efficiency 1X7 PC Strand Production Line
US$150,000.00-400,000.00
1 Piece(MOQ)
Automatic Spiral Cold Rolling Production Line for Ribbed Reinforcing Steel Bar
US$25,000.00-30,000.00
1 Piece(MOQ)
Spiral Cold Rolling Ribbed Steel Bar Drawing Production Line
US$25,000.00-30,000.00
1 Piece(MOQ)
Premium PC Steel Bar Production Line for Industrial Applications
US$90,000.00-95,000.00
1 Piece(MOQ)
Factory Price Highly Efficiencypc Strand Prestressing Steel Strand Production Line
US$150,000.00-400,000.00
1 Piece(MOQ)
Cold-Formed Steel Pipe Production Line for Industrial Machinery
US$500,000.00-10,000,000.00
1 Piece(MOQ)
High-Quality PC Bar Production Line for Railway Foundation Cages
US$200,000.00-220,000.00
1 Set(MOQ)
Scrap Steel Bar Recycle Cold Rolled Deformed Bar Making Production Line
US$30,000.00-100,000.00
1 Piece(MOQ)
Auto High-Hardness 55 Cone Double-Screw Angular Line Production
US$3,000.00
1 Piece(MOQ)



















