Powered by Made-in-China.com
Reduces Construction Time Impact-Resistant High-Quality Geomembrane for Subways and Underground Structures
US$0.56
1,000-9,999 Square Meters
US$0.50
10,000-49,999 Square Meters
US$0.42
50,000+ Square Meters
Product profile
Customization
AvailableAfter-sales Service
Installation GuidanceWarranty
5 YearModel NO.
Composite Geotextile GeomembraneColor
Black, White or as RequiredApplication
Electrical Engineering, Roads & Railways & Airports Project, Water Conservancy ProjectFunction
Reinforcement, DrainageClassification
Composite Impervious GeomembraneMaterial
PPType
Composite GeotextileRoll Length
50m-200mStandard Elongation
30-100Peeling Strength
6n/Cm Min (GB/T 17642-2008)Length
CustomizedWidth Deviation
-1% (GB/T 17642-2008)Transport Package
Exporting Special PackingSpecification
CustomizedTrademark
wdfOrigin
Shandong, TaianProduction Capacity
50000 Square Meters/ DayKey features
Composite Structure: Combines geotextile tensile strength with geomembrane impermeability for leak resistance.
High Durability: Features tear, puncture, acid, alkali, and corrosion resistance for long-term use.
Wide Application: Suitable for landfills, water treatment, roads, aquaculture, and underground structures.
Customizable Size: Length is customized, with roll lengths ranging from 50m to 200m.
Temperature Resistance: Polymer and anti-aging materials allow use in unconventional temperature environments.
5-Year Warranty: Comprehensive 5-year warranty coverage with installation guidance support.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 17 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.37h
AI-Powered supplier vetting
SummaryThe supplier manufactures and sells geotechnical, plastic, rubber, waterproofing, fiber, composite, and related building materials, with import and export rights. It reports multiple production lines and a broad product range, plus in-stock service capability and an export history of 17 years. Customization is available from samples, designs, through full, minor, and flexible customization. However, it is not identified as a professional technical supplier and does not provide 3D software design services. Service-management documentation is weak: complaint handling and corrective/preventive action procedures or records are absent, while supplier-service assessment records are incomplete. Financial-period information is provided, but no financial performance results are available. Overseas warehouse and showroom capabilities are absent, and outsourcing controls are unknown. One year of R&D engineer experience and 11–20 quality-control staff are reported.
Supplier typeThe supplier is explicitly not a professional technical supplier. Its stated scope centers on manufacturing and selling geotechnical materials, plastics, rubber products, waterproofing products, fibers, composites, and synthetic materials, with import and export activities.
After-Sales capabilityThe supplier has no written procedures or records for effective complaint handling or corrective and preventive actions, and its service-capability assessment is only partially documented. It does have in-stock service capability, but no overseas warehouse or showroom capability is reported.
Production capacityThe supplier reports many production lines, a large-scale and broad-range geotechnical-material operation, manufacturing coverage across several material categories, in-stock capability, and 11–20 quality-control staff. Its outsourcing procedure and manufacturing-capacity contract status are unknown, so production governance is not fully documented.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. This indicates broad stated customization coverage, although 3D software design services are not provided.
Product Q&A
Q:Can you do OEM?
A:
Yes, of course. We can produce the products as your requests. It would be better if you could provide us with samples.
Q:If I want to order a small quantity goods, can you do it?
A:
If the product you need we have stock available, then it is OK. But if no stock available, don't worry, we can take your order with our other clients' order to produce together, but it needs to wait some time.
Q:Can I get a sample from your company? Should I pay for the express fee?
A:
If you can accept our available sample, we can offer free sample to you. After confirming your order, the sample's freight cost will be refunded.
Q:How will you follow my order?
A:
When the goods are started to produce, we will take photos for the goods and send it to you.
Q:What is the warranty period?
A:
We provide a 5-year warranty for this composite geomembrane liner.
Send Inquiry
*To:
Taian Wdf Polymer Composites Co., Ltd.
Taian Wdf Polymer Composites Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Reduces Construction Time High and Low-Temperature Resistant Geomembrane for Urban Landscape Ponds
US$0.50-3.00
1,000 Square Meters(MOQ)
UV-Resistant HDPE Geomembrane for Impact and Puncture Protection
US$0.50-3.00
1,000 Square Meters(MOQ)
High Quality Two Cloth and One Film 250g/0.5mm/250g Composite Waterproof Geomembrane Membrane for Landfill
US$0.48-5.64
1,000 Square Meters(MOQ)
Lightweight Microbial Resistance HDPE/LDPE Geomembrane for Subways and Underground Structures
US$0.30-0.50
1,000 Square Meters(MOQ)
Customizable Thickness HDPE Geomembrane for Subways and Underground Structures
US$0.50-3.00
1,000 Square Meters(MOQ)
Factory Sale Compound Geomembrane for Road Construction, Traffic Tunnel and Environmental Protection.
US$0.99-1.86
2,000 Square Meters(MOQ)
Dam Biogas Digesters Road Construction and Water Tanks 0.5mm HDPE Geomembrane Composite Sale for Pool
US$0.99-1.86
1,000 Square Meters(MOQ)
Anti Puncture Anti-Seepage Composite Geomembrane Used in Geotechnical and Construction Engineering
US$0.80-2.11
2,000 Pieces(MOQ)
High-Quality Composite Impermeable Geomembrane for Dam and Reservoir Use
US$0.50-3.03
1,000 Square Meters(MOQ)
High Quality Geomembrane with 1mm HDPE Pond Dam Liner Anti-UV Fish Farm Outdoor Use Versatile for Landfill Polyethylene Plastic LLDPE
US$0.25-1.18
1,000 Square Meters(MOQ)
High Quality Waterproof 1.0mm/1.5mm Thickness Geomembrane for Dam Liner
US$0.48-5.64
1,000 Square Meters(MOQ)
Impermeable Barriers Made of Laminated Composite Geomembrane for Ponds and Dams
US$0.48-5.64
2,000 Square Meters(MOQ)
Two Cloths and One Membrane Composite Geomembrane for Waste Treatment Plants
US$0.40-3.00
1,000 Pieces(MOQ)
Composite Geomembrane Geotextile Liner for Landfill Pond Waterproofing and Leak Control
US$0.48-5.64
2,000 Square Meters(MOQ)
Geocomposite Dimple Geomembrane for Waterproofing and Drainage
US$0.70-3.30
1,000 Square Meters(MOQ)
Rough Surface HDPE Geomembrane High Tear Strength Waterproof Membrane for Construction
US$0.30-0.70
10,000 Square Meters(MOQ)
High Quality HDPE LDPE Sheet Suppliers Composite Geomembrane for Indonesia
US$1.19-2.26
1,000 Square Meters(MOQ)
Compound Geomembrane for Road Construction
US$0.99-1.77
5,000 Square Meters(MOQ)



















