Powered by Made-in-China.com
Cost-Effective Zinc Coating C-Shaped Steel for Logistics Centers
US$769.28-920.00
50 Tons
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportConnection Form
Bolted/Self-Tapping ScrewModel NO.
C100Feature
Anti-Corrosion, Earthquake Resistance, High Intensity, RecyclableBase Material
Q235B Hot-DIP Galvanized Steel StripBase Material1
Q355b Hot-DIP Galvanized Steel StripStandard
GB/T 6728-2017 / GB 50018-2002Height a
100 - 300 mmFlange B
40 - 100 mmLip C
15 - 25 mmThickness
1.5 - 3.0 mmLength
Custom Per Span (Generally 3-12m)Zinc Coating
60 - 275 G/M2Yield Strength
≥35 - 355 MPaTensile Strength
≥370 - 510 MPaMaterial Saving Vs Channel
About 30%Exchange Rate
6.7743Material Range
Q235B/Q355bhot-DIP GalvanizedTransport Package
Bundled + Wooden PalletSpecification
C100-C300Origin
ChinaHS Code
721633000Key features
Light Weight High Strength: Uses high strength galvanized steel, saves 30% material compared to channel steel.
Quick Installation: Factory prefabricated with bolted connection, 2-3 times faster than traditional sections.
Anti-Corrosion Durable: Hot-dip galvanized with 60-275g/m2 zinc coating, lifespan 20-30 years.
Complete Size Range: C100-C300 models available with height 100-300mm and thickness 1.5-3.0mm.
Ample Stock Availability: Over 2,000 tonnes ready stock with same-day pickup for common sizes.
Custom Length Processing: Custom length cutting, punching, and bending services available per span.
Earthquake Resistance: Designed with high intensity and stability for seismic zones.
Direct Source Supply: Self-manufacturing with 40,000 tons annual capacity from mill resources.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo. 1, Building 7, No. 98 Linhang Avenue, Leidian Town, Huzhou, Zhejiang, China
Plant Area5799 square meters
Registered Capital10,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity10 kg
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Bar Truss, C Purlin, Z Purlin, Open-Type Floor Deck, Closed-Type Floor Deck, Steel Bar Truss Floor Deck, Color Steel Tile, Rock Wool Sandwich Panel, EPS Sandwich Panel, PU Sandwich Panel
Production MachinesBending Machine
Inspection Type for Finished ProductsRandom inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2015-03-24
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Overseas Agent/BranchNo
Product Q&A
Q:What is the difference between C and Z steel purlin?
A:
1) Section: C is C-type (opening to one side), Z is Z-type (flanges reversed); 2) Load-bearing: Z has 10-15% better vertical bending performance for large spans; C has balanced performance for walls; 3) Lapping: Z can lap directly, C needs splice plate; 4) Slope: Z suits slopes >1/10, C suits various slopes; 5) Price: Z is 5-10% higher; 6) Use: Z for roofs, C for walls.
Q:How to choose C steel purlin model?
A:
Selection basis: 1) Span: <4m use C120-C160, 4-6m use C160-C220, >6m use C220-C300; 2) Load: Higher loads need higher height/thickness; 3) Spacing: Larger spacing needs larger model; 4) Material: Q355B is 50% stronger than Q235B; 5) Economy: Prioritize low steel consumption. We provide technical consultation.
Q:How to choose C steel purlin zinc coating?
A:
1) Environment: Indoor dry 60-80g/m2, outdoor/humid 120-180g/m2, corrosive 200-275g/m2; 2) Design: Civil 80-120g/m2, Industrial 120-180g/m2; 3) Life: 60g/m2 (10-15y), 80g/m2 (15-20y), 120g/m2 (20-25y), 180g/m2 (25-30y), 275g/m2 (30+y). We offer 60-275g/m2 options.
Q:What are the C steel purlin installation steps?
A:
1) Layout: Mark positions and spacing (1.0-1.5m); 2) Lifting: Crane lift, note opening direction (down for roof, inward for wall); 3) Fixing: Bolt/screw connection (2-3 bolts/end), splice plate lapping (>=200mm); 4) Correction: Adjust straightness (<=L/1000), flatness, spacing; 5) Support: Install tie rods, struts, knee braces; 6) Inspection: Check firmness and alignment. Wear harness for height safety.
Q:What are the MOQ and lead time?
A:
Stock: 1 piece, 3-7 days; Common sizes (C160-C250, 2.0-2.5mm): same-day pickup. Special models/custom processing: 5 tonnes, 7-15 days. Services include custom length cutting, punching, bending, and matching parts.
Send Inquiry
*To:
Taihui Metal Materials Co., Ltd
Taihui Metal Materials Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
China Factory Zinc Coating C-Section Steel for Convention Centers
US$769.28-920.00
50 Tons(MOQ)
Factory Price Durable C-Shaped Steel for Logistics Centers
US$769.28-920.00
50 Tons(MOQ)
Cost-Effective Large Span Stable Steel Construction for Cold Chain Center
US$38.00-48.00
100 Square Meters(MOQ)
Superior Quality Zinc Coating C Channel Steel for Convention Center Building
US$769.28-920.00
50 Tons(MOQ)
High Performance Zinc Coating Channel Steel for Logistics Center Structure
US$769.28-920.00
50 Tons(MOQ)
Cost-Effective Galvanized H-Steel for Strong and Long-Lasting Support
US$450.00-600.00
1 Ton(MOQ)
Anti-Rust Steel Structure for Factory Renovations with Fluorocarbon + Zinc + Epoxy Triple Coating Steel Construction
US$30.00-70.00
1,000 Square Meters(MOQ)
Cost-Effective Prefabricated Steel Factory Solutions for Global Buyers
US$50.00-80.00
100 Square Meters(MOQ)
Anti-Corrosive Steel Structure for Common Airport Auxiliary Facilities with Tin-Zinc Coating Steel Construction
US$30.00-70.00
1,000 Square Meters(MOQ)
Premium Galvanized H-Steel Long-Lasting, Cost-Effective for All Your Structural Projects
US$450.00-600.00
1 Ton(MOQ)
Wide Span Prefab Steel Storage Facility for Regional Logistics Centers
US$35.00-248.00
200 Square Meters(MOQ)
Heavy-Duty Galvanized H-Steel Beams-High Zinc Coating for Corrosion Resistance
US$450.00-600.00
1 Ton(MOQ)
Weather-Resistant Steel Structure for Railway Stations with Zinc Coating + Anti-Freezing + Anti-Corrosion Steel Construction
US$30.00-70.00
1,000 Square Meters(MOQ)
Heavy-Duty Steel Storage Center for Efficient Logistics Management
US$50.00-80.00
100 Square Meters(MOQ)
Large-Span Prefabricated Steel Structure for Universal Logistics Centers with High Load-Bearing + Anti-Sway Design Steel Construction
US$30.00-70.00
1,000 Square Meters(MOQ)
Prefab Best Cost-Effective Industrial Light Steel Structure for Workshop
US$40.00-160.00
200 Square Meters(MOQ)
Maded in China Cost-Effective Light Steel Frame Warehouse for Quick Assembly
US$25.00-50.00
500 Square Meters(MOQ)
U/C Shaped Channel Steel for Railway & Road Construction
US$450.00-600.00
1 Ton(MOQ)



















