SourcingAI
Try for free
Powered by Made-in-China.com
Galvanized Steel I Beam for Warehouse Steel Structure Building Frame Construction
US$560.00
5 Tons

Product profile

Customization

Available

After-sales Service

Online Technical Support

Connection Form

Bolted/Self-Tapping Screw

Model NO.

GB/T 706 + GB/T 13912

Feature

Anti-Corrosion, Earthquake Resistance, High Intensity, Recyclable

Install

Online Guidance

Material

Q235B / Q355b

Standard

GB/T 706 + GB/T 13912

Size

#10 ~ #40

Height H

100 - 400 mm

Flange Width B

68 - 144 mm

Avg Zinc Coating

>=85 Um

Yield Strength

235 - 355 MPa

Length

6m / 9m / 12m / Cut to Length

Surface Treatment

Hot-DIP Galvanized

Theoretical Weight

11.2 - 67.6 Kg/M

Anti-Corrosion Life

20-30 Years

Transport Package

Bundled + Wooden Pallet

Specification

Q235B/Q355B hot-dip galvanized 10# ~ 40#

Origin

China

HS Code

7216102000

Key features

Long-Lasting Anti-Corrosion - Zinc coating >=85um, 20-30 year life in normal atmosphere, 3-5 times longer than painted I-beams.
Complete Coverage - Zinc covers all surfaces including inner flange and web, 360-degree protection.
Self-Healing Scratches - Minor scratches self-repair through zinc sacrificial anode action.
Complete Sizes - #10 to #40 common sizes, fabricate-then-galvanize or galvanize-then-fabricate.
Reliable Material - Q235B/Q355B structural steel, mechanical properties unchanged after galvanizing, yield 235-355MPa.
Ample Stock - 2,000+ tonnes ready stock, long-term galvanizing cooperation, stable quality fast delivery.

Company profile

Taihui Metal Materials Co., Ltd
High Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.02h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressNo. 1, Building 7, No. 98 Linhang Avenue, Leidian Town, Huzhou, Zhejiang, China
Plant Area5799 square meters
Registered Capital10,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity10 kg
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsSteel Bar Truss, C Purlin, Z Purlin, Open-Type Floor Deck, Closed-Type Floor Deck, Steel Bar Truss Floor Deck, Color Steel Tile, Rock Wool Sandwich Panel, EPS Sandwich Panel, PU Sandwich Panel
Production MachinesBending Machine
Inspection Type for Finished ProductsRandom inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-03-24
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Overseas Agent/BranchNo

Product Q&A

Q:Price difference between galvanized and regular I-beam?
A:
Galvanized I-beam costs about RMB 800-1200/tonne more (galvanizing fee), depending on size and zinc requirements. But galvanized lasts 3-5 times longer, lower lifecycle cost. Recommend galvanizing for outdoor projects.
Q:How to handle welding after galvanizing?
A:
Welding damages local zinc layer; after welding, clean slag and spatter with angle grinder, then apply two coats of zinc-rich primer (zinc >=92%), then galvanizing repair compound or silver paint. Repaired area corrosion performance should match overall zinc layer.
Q:How is zinc thickness guaranteed?
A:
Per GB/T 13912, for steel >=6mm thick, average zinc >=85um. We spot check each batch with magnetic gauge, 5 points per member averaged, provide inspection report at delivery.
Q:Can custom cut to length?
A:
Yes. Standard 6m, 9m, 12m, special up to 15m. Recommend cut and drill first, then galvanize as whole, so cut surfaces and holes also have zinc protection.
Q:MOQ and lead time?
A:
Stock: 1 tonne MOQ, 3-7 days. Galvanizing required: 5 tonnes MOQ, 7-15 days. Large orders can lock capacity for batch delivery.

Send Inquiry

*To:Taihui Metal Materials Co., LtdTaihui Metal Materials Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Steel Structure Storage Hangar Building for Warehouse
Made-in-China.com
High Quality Steel Structure for German Market
Made-in-China.com
Lightweight Reinforced Steel Frame Construction for Modern Buildings
Made-in-China.com