SourcingAI
Try for free
Powered by Made-in-China.com
High Load Bearing Structural Floor Deck for Large Convention Center Projects
US$940.00-1,120.00
2 Tons

Product profile

Customization

Available

Connection Method

Welding

Installation Method

On-site Assembly

Model NO.

TD1

Application

Warehouse, High-Rise Building, Residential Building, Commercial Building, Industrial Building

Standard

Jg/T 368-2012 / GB 50017-2017

Common Models

Td1 / Td2 / Td3 / Td4 / Td5 / Td6 / Td7

Truss Height

60 - 350 mm

Slab Thickness

80 - 370 mm

Plate Width

Type a 600mm / Type B 576mm

Length

Custom Per Span (Generally 1.5-12m)

Top/Bottom Chord Rebar

Phi6 - Phi12 mm (HRB400

Web Rebar

Phi4 - Phi8 mm (Hpb300)

Bottom Form Material

Hot-DIP Galvanized Steel 0.4-0.75mm

Zinc Coating

40 - 120 G/M2

Yield Strength

Rebar ≥400MPa / Steel ≥235MPa

Concrete Strength

C20 - C40

Shear Stud Size

Phi13 - Phi19 mm

Material Range

HRB400 Rebar+Q235bgalvanized Base Sheet

Exchange Rate

6.7743

Transport Package

Bundled + Wooden Pallet

Specification

russheight60-350mm, slabthickness80-370mm

Origin

China

Key features

No On-site Rebar Tying: Factory prefabricated truss allows direct concrete pouring, 2-3 times faster construction speed.
High Load-bearing Capacity: Composite structure offers 30-50% higher load capacity than ordinary profiled steel decks.
Removable Bottom Form: Galvanized bottom form can be reused 3-5 times or left as permanent ceiling to save costs.
Factory Automated Welding: Ensures precise rebar spacing and stable quality, avoiding on-site fluctuation.
Wide Model Range: TD1-TD7 series with truss heights 60-350mm and slab thicknesses 80-370mm available.
Large Stock Availability: Over 500 tonnes ready stock with 3-7 day pickup for common models.
Custom Length Processing: Length customizable per span, generally 1.5-12m, with matching services available.
Compliant with Standards: Meets JG/T 368-2012 and GB 50017-2017 standards for structural safety.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Shanghai Port CertifiedTerms of Payment: LC, T/T, D/P, etc. CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW

About Our Factory & Business Background

AddressNo. 1, Building 7, No. 98 Linhang Avenue, Leidian Town, Huzhou, Zhejiang, China
Plant Area5799 square meters
Registered Capital10,000,000 RMB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity10 kg
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsSteel Bar Truss, C Purlin, Z Purlin, Open-Type Floor Deck, Closed-Type Floor Deck, Steel Bar Truss Floor Deck, Color Steel Tile, Rock Wool Sandwich Panel, EPS Sandwich Panel, PU Sandwich Panel
Production MachinesBending Machine
Inspection Type for Finished ProductsRandom inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-03-24
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Overseas Agent/BranchNo

Product Q&A

Q:What is the difference between steel truss deck and ordinary profiled steel floor deck?
A:
1) Structure: Steel truss deck is factory prefabricated with truss and form; ordinary deck needs on-site rebar tying. 2) Construction: Steel truss deck is 2-3 times faster without rebar tying. 3) Load-bearing: Steel truss deck is 30-50% stronger for large spans. 4) Quality: Factory welding ensures stability vs. on-site fluctuation. 5) Bottom form: Steel truss form is removable/reusable; ordinary is permanent. 6) Price: Steel truss is higher upfront but saves labor, making total cost similar.
Q:Can the steel truss deck bottom form be removed?
A:
Yes. It can be left as permanent formwork/ceiling or removed after concrete reaches 75%+ strength (7-14 days). Removed forms can be reused 3-5 times to save costs, though it adds labor. We supply both options.
Q:How to choose the correct steel truss deck model?
A:
Select based on slab thickness (TD3: 120mm, TD4: 150mm, TD5: 190mm), span (TD1-3 for <3m, TD3-5 for 3-4m, TD5-7 for >4m), and load requirements. Structural engineers should calculate based on drawings; we provide technical consultation.
Q:What are the installation steps for steel truss deck?
A:
1) Layout: Mark beam positions and starting lines. 2) Laying: Lift with crane and lay manually, noting lap direction. 3) Fixing: Weld shear studs to beams and screw plates together. 4) Sealing: Install end closures and edge trim. 5) Pouring: Pour concrete directly (no rebar tying). 6) Removal: Optional removal after curing.
Q:What are the MOQ and lead time requirements?
A:
MOQ is 10m or 200kg. Stock items (TD3-TD5) are available in 3-7 days. Special models or custom lengths require 7-15 days for production starting from 5 tonnes.

Send Inquiry

*To:Taihui Metal Materials Co., LtdTaihui Metal Materials Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Versatile Steel Bar Truss Deck for Construction and Design
Made-in-China.com