SourcingAI
Try for free
Powered by Made-in-China.com
Automatic Glass Bottle Beer 3-in-1 Unit Filling Packaging Production Line
US$12,000.00-300,000.00
1 Set

Product profile

Customization

Available

After-sales Service

for Year Service

Warranty

One Year

Model NO.

DCGF

Condition

Used

Customized

Customized

Voltage

380V

Composition

Filling Machine

Processing Material

Fruit Condensation Juice or Power

Process

Prepare Sterilizer Filling Labeling Packing System

Suit Bottle Type

Glass Bottle

Suit Cap Type

Crown Cap&Crown Cap&Al Cap&Plastic Cap

Certificate

CE ISO SGS

Inspection

Support Client Transport Come Local to Check

Transport Package

Wooden Case

Specification

8-8-3 16-12-6 24-24-8 32-32-10 40-40-12

Trademark

tango

Origin

Zhangjiagang

HS Code

8422301090

Key features

3-in-1 Monoblock Design: Integrates washing, filling, and capping into a single fully automatic machine.
High Production Capacity: Models range from 4,000 to 24,000 bottles per hour for various output needs.
Customizable Configuration: Supports customized bottle types, cap types, and certificate requirements.
Versatile Material Processing: Suitable for fruit condensation juice, powder, and other beverage materials.
Comprehensive Certification: Equipped with CE, ISO, and SGS certificates for quality assurance.
Flexible Payment Terms: Accepts LC, T/T, and Western Union for convenient international transactions.
Global Export Experience: Serves markets in North America, Europe, Asia, Africa, and Oceania.
Support for Client Inspection: Clients are welcome to visit locally to check the machine before shipment.

Company profile

Business Type: Trading CompanyExport Year: 2012-08-01Nearest Port: shanghai port, ningbo port, guangzhou portAverage Response Time: ≤6.27hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CIF, EXW

About Our Factory & Business Background

AddressWu Ke Song Road, Sanxing, Zhangjiagang, Jiangsu Province, Chian. 215600, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months

Our Production Capability & Technical Expertise

Main ProductsWater Bottle Filling Produdction Line, 3in1 Bottle Filling Machine, Bottlig Machine, Wrapping Machine, Labeling Machine, Carton Package Machine, Beverage Filling Machine, Juice Production Line, Carbonated Beverage Production Line, 5gallon Production Line

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the warranty period for this machine?
A:
We provide a one-year warranty for the equipment.
Q:What is the voltage requirement for the production line?
A:
The standard voltage requirement is 380V.
Q:What types of bottles and caps are supported?
A:
It supports glass bottles with crown caps, aluminum caps, and plastic caps.
Q:What is the average lead time for production?
A:
The lead time is typically 1-3 months, regardless of peak or off-peak seasons.
Q:What are the available payment terms?
A:
We accept LC, T/T, and Western Union.

Send Inquiry

*To:Zhangjiagang City Tango Machinery Co., Ltd.Zhangjiagang City Tango Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Automatic Bottled Wine/Vodka/Whisky Production Line

Automatic Bottled Wine/Vodka/Whisky Production Line

US$9,000.00-180,000.00
1 Piece(MOQ)
Made-in-China.com