Powered by Made-in-China.com
China Complete Packaged Bottled Drinking Water Bottling Packing Filling Line
US$5,000.00-30,000.00
1 Set
Product profile
Customization
AvailableType
Volumetric Filling MachineAutomatic Grade
Fully AutomaticModel NO.
CGF18-18-6Material Type
LiquidFilling Valve Head
Multi-HeadFeed Cylinder Structure
Multi-Room FeedingDosing Device
RotorFilling Principle
PressurePackaging Container Lifting Structure
Pneumatic LiftingStructure
RotaryPackaging
BottlePackaging Material
PlasticAdvantage
Low Manpower, Low Electricity ConsumptionGuarantee
One YearBottle Type
500ml 1500ml 1000ml 2000mlSuit Product
Pure Water, Spring Water, Mineral WaterAfter Sale Service
Engineer Go Local Install, Train BuyerDelivery Time
30-60dayCapacity
1000bph 3000bph 5000bph 8000bph 11000bphCapacity 2
13000bph 15000bph 18000bph 21000bphBig Bottle Volume
3L 5L 7L 10L 18.9L 19L 20L 5gallonAdvantage 2
Low Manpower, Low Electricity ConsumptionTransport Package
Wooden CaseSpecification
8-8-3 16-12-6 24-24-8 32-32-10 40-40-12 50-50-15Trademark
tangoOrigin
Zhangjiagang, ChinaHS Code
8422301090Production Capacity
200set/YearKey features
Fully Automatic Operation: Adopts bottle block neck transit technology for full auto sterilization, washing, filling, and capping.
Stainless Steel Construction: Liquid contact parts made of super stainless steel with food-grade rubber for hygiene.
Comprehensive After-Sale Service: Engineers provide on-site installation, debugging, and free staff training.
24/7 Technical Support: After-sale department offers 24 hours 7 days service with quick response to questions.
Flexible Capacity Options: Available capacities range from 1000 to 21000 bottles per hour for various bottle sizes.
One Year Warranty: Provides a one-year guarantee period for the machine.
Customization Support: OEM and ODM accepted; customer design and logo are welcome.
Company profile

Business Type: Trading CompanyExport Year: 2012-08-01Nearest Port: shanghai port, ningbo port, guangzhou portAverage Response Time: ≤6.17hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, CIF, EXW
About Our Factory & Business Background
AddressWu Ke Song Road, Sanxing, Zhangjiagang, Jiangsu Province, Chian. 215600, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months
Our Production Capability & Technical Expertise
Main ProductsWater Bottle Filling Produdction Line, 3in1 Bottle Filling Machine, Bottlig Machine, Wrapping Machine, Labeling Machine, Carton Package Machine, Beverage Filling Machine, Juice Production Line, Carbonated Beverage Production Line, 5gallon Production Line
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the delivery time?
A:
Delivery takes 60 days after receiving the down payment.
Q:What are the payment terms?
A:
30% deposit by T/T before order; 70% balance by T/T after inspection before delivery.
Q:Do you provide installation and training?
A:
Yes, our engineer goes to the buyer's factory for installation, adjustment, and operator training.
Q:Who pays for the engineer's travel costs?
A:
The buyer pays for the engineer's visa, round air tickets, food, and board, plus USD 80 per day.
Q:What is the warranty period?
A:
We provide a one-year guarantee for the machine.
Send Inquiry
*To:
Zhangjiagang City Tango Machinery Co., Ltd.
Zhangjiagang City Tango Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Fully Automatic Complete Pet Bottled Drinking Water Plant Unit Water Filling Packaging Bottling Production Line
US$15,000.00-48,000.00
1 Piece(MOQ)
Automatic 3in1 Pet Plastic Bottled Pure Mineral Drinking Water Bottling Filling Machine Complete Production Line
US$13,000.00-150,000.00
1 Set(MOQ)
Automatic Complete Drinking Mineral Pure Water Bottle Filling Machinery Bottling Plant Production Line
US$13,000.00-150,000.00
1 Set(MOQ)
Complete Pure Mineral Bottled Water Production Line for Filling Process
US$11,000.00-75,000.00
1 Piece(MOQ)
Complete Drinking Water Bottling Production Line 3000 Bph Full Water Treatment and Production Line
US$10,000.00-15,000.00
1 Set(MOQ)
Turnkey Project for Complete Mineral Drinking Water Bottling Line
US$4,500.00-75,000.00
1 Piece(MOQ)
Automatic 3 in 1 Pure Mineral Drinking Plastic Bottling or Glass Bottling Mineral Water Filling Production Line
US$8,800.00-9,800.00
1 Set(MOQ)
a-Z Full Complete Water Production Line Include Water Filling Machine / Packing Line / Water Treatment Plant
US$30,000.00-300,000.00
1 Piece(MOQ)
Fully Automatic 3000bph 2.5L-10L High Efficiency Bottled Drinking Water Bottling&Production Line for Factories
US$10,000.00-40,000.00
1 Piece(MOQ)
Sokos Turnkey 15000bph Pet Bottle Filling Line Complete Drinking & Mineral Water Bottling Plant
US$37,300.00-38,800.00
1 Piece(MOQ)
Automatic Bottled Water Filling 5000 Bph Small Mineral Water Bottling Plastic Bottle Water Bottling Production Line
US$10,000.00-15,000.00
1 Set(MOQ)



















