Powered by Made-in-China.com

JIS G3445 Stkm12c Carbon Steel Pipe for Bicycle
US$600.00-950.00
2 Tons
Sample price:US$0.00/piece.Request sample
Product profile
Customization
AvailableType
SeamlessTechnique
Hot Rolled&Cold Rolled&Cold DrawnMaterial
Carbon Steel&Aolly Steel&Stainless SteelSurface Treatment
Black&Varnish Coating&3lpe&PEUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & DecorationSection Shape
RoundWt
1.5-30mmLength
2-20metersLoading Port
Tianjin/Shanghai/QingdaoSteel Grade 1
API 5L ASTM A106/A53 Gr.B /X42/X52/X65/X60Steel Grade 2
ASME SA789uns S31803, Uns S32205, Uns S31500, UnsSteel Grade 3
A333 Gr.6 A335 P5 SA199/SA213 T5 P11 T22Carbon Steel Production
80000tons/YearStainless Steel Production
15000tons/YearAlloy Steel Production
30000tons/YearCasing&Tubing
100000tons/YearTransport Package
Galvanized Steel Strip&Wooden Case in Bundle,Specification
OD15MM-700MMTrademark
OEM/TJTCOrigin
Hebei/Anhui/Jiangsu/ZhejiangHS Code
7304Production Capacity
80000&15000&30000&100000tonsKey features
Wide Material Selection: Available in Carbon Steel, Alloy Steel, and Stainless Steel grades.
Multiple Manufacturing Techniques: Offered via Hot Rolled, Cold Rolled, and Cold Drawn processes.
Customizable Dimensions: Wall thickness 1.5-30mm and length 2-20 meters available.
Versatile Surface Treatments: Options include Black, Varnish Coating, 3LPE, and PE coatings.
High-Pressure Boiler Tubes: ASTM A192/A192M certified for high-pressure service applications.
Heat Exchanger Application: SA179/SA192 grade suitable for condensers and heat transfer apparatus.
Large Production Capacity: Annual capacity of 80,000 tons for Carbon Steel and 15,000 for Stainless Steel.
Global Shipping Ports: Convenient loading from Tianjin, Shanghai, and Qingdao ports.
Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2013-12-28Nearest Port: Tianjin/Xingang, Shanghai, QingdaoAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, DDP, DAP, CIP, CPT, FCA, EXW
About Our Factory & Business Background
AddressRoom908, Building B, Haitai Information Plaza, No. 8 Huatian Road, Huayuan Industrial Zone, Binhai High-Tech Zone, Tianjin, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsSeamless Pipe/Boiler Tube, Alloy Steel Seamless Pipe, API 5CT Petroleum Tubing Casing, Stainless Steel Seamless Tubes, Slotted Casing Seamless Pipe, API 5L Seamless Pipes, Home and Living Chair, Copper Tubes, Nickel Alloy Tube, Home and Living Table
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What materials are available for the pipes?
A:
We offer Carbon Steel, Alloy Steel, and Stainless Steel options.
Q:What manufacturing techniques do you use?
A:
Our pipes are produced using Hot Rolled, Cold Rolled, and Cold Drawn techniques.
Q:Can the pipe dimensions be customized?
A:
Yes, wall thickness ranges from 1.5 to 30mm, and lengths from 2 to 20 meters.
Q:What surface treatments are available?
A:
We provide Black, Varnish Coating, 3LPE, and PE surface treatments.
Q:What are the lead times for production?
A:
Peak season lead time is one month, while off-season is within 15 workdays.
Send Inquiry
*To:
TIANCHENG METAL MATERIAL(TIANJIN) CO., LTD.
TIANCHENG METAL MATERIAL(TIANJIN) CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
JIS G3445 Stkm14b Carbon Steel Pipe for Bicycle
US$600.00-950.00
2 Tons(MOQ)
JIS G3445 Stkm13c Carbon Steel Pipe for Bicycle
US$600.00-950.00
2 Tons(MOQ)
Stkm17A Stkm17c JIS G3445 Carbon Steel Pipe for Machine Structural Purpose
US$699.00-899.00
20 Tons(MOQ)
JIS G3445 Stkm13b Carbon Steel Pipe for Bicycle
US$600.00-950.00
2 Tons(MOQ)
JIS G3445 Stkm12c Carbon Steel Pipe for Automobile
US$600.00-950.00
2 Tons(MOQ)
Stkm 11A Steel Pipe JIS G3445 Carbon Steel Pipe for Machine Structural Purpose
US$699.00-899.00
20 Tons(MOQ)
Stkm14A Stkm14b Stkm14c JIS G3445 Carbon Steel Pipe for Machine Structural Purpose
US$699.00-899.00
20 Tons(MOQ)
JIS G3445 Stkm12c 13c 6mm 8mm 10mm Thick Wall Steel Tube Cold Drawn Seamless Pipe
US$1.50-7.00
1,000 kg(MOQ)
Stkm 12A Steel Pipe JIS G3445 Carbon Steel Pipe for Machine Structural Purpose
US$699.00-899.00
20 Tons(MOQ)
JIS G3445 Hydraulic Ck22 Carbon Steel Round Pipe for Industry Jacks
US$1.50-3.00
500 kg(MOQ)
Premium JIS G3445 Steel Pipes for Global Distribution Needs
US$1,000.00
3 Tons(MOQ)
ASTM A519 4130 4140 Chrome Plated Polishing Surface for Motorcycle Bicycle Frame Alloy Steel Pipe
US$1.50-7.00
1,000 kg(MOQ)
JIS G3445 Carbon Material Cold Drawn Seamless Steel Pipe for Construction Machinery
US$1.50-7.00
1,000 kg(MOQ)
Hot-Rolled Seamless Carbon Steel Pipe Tube JIS/DIN Standard for Oil Boiler Applications ANSI/ASME Certified
US$510.00-550.00
5 Tons(MOQ)
JIS G3445 Stkm11A Carbon Steel Pipes
US$1,000.00-1,300.00
10 Pieces(MOQ)
Premium G3445 Seamless Carbon Steel Pipe for Oil and Gas
US$510.00-530.00
5 Tons(MOQ)
JIS G3458 G3462 Carbon Steel Heat Resistant Pipes for Mechanical Manufacturing
US$0.55-0.65
25,000 kg(MOQ)



















