SourcingAI
Try for free
Powered by Made-in-China.com
High Flexibility H20 Timber Beam Slab Formwork
US$65.00
300-599 Square Meters
US$60.00
600+ Square Meters

Product profile

Customization

Available

Material

Wood and Steel

Usage

for Slab and Decking

Model NO.

TECON Slab Flex 20

Type

Slab Formwork

Size

Customized

Permitted Fresh Concrete Pressure

Customized

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Key features

Totally Customized Solution: Tailored to specific slab thickness and storey height for your project.
High Flexibility Design: Adjustable girder spacing and shoring allow production of slabs with varying heights and thicknesses.
Durable Material Composition: Consists of 18mm/21mm WBP film-faced plywood, EN13377 H20 timber beams, and HDG shoring parts.
Versatile Shoring Options: Props with 10-30KN capacity (2.5-5m length) and towers with 35-60KN capacity for extreme heights.
Comprehensive Technical Support: Includes consultancy, Auto-cad planning, shop drawings, manuals, and on-site supervision.
Strict Quality Assurance: Certification of Quality issued per batch, with pre-shipment inspection and test reports available.
Fast Delivery Service: Standard export packages ensure fast delivery from fabrication to your site.
Wide Application Scope: Suitable for residential, commercial, bridges, dams, and other civil engineering projects.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤24hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:What is the warranty period?
A:
The provided text does not specify a warranty period.
Q:What are the main components of the formwork?
A:
The main components are 18mm/21mm film-faced plywood, H20 timber beams (EN13377), shoring props, and shoring tower bars.
Q:Is the product customizable?
A:
Yes, the solution is totally customized according to different slab thickness and storey height, with customized size and permitted fresh concrete pressure.
Q:What are the payment terms?
A:
The terms of payment are LC (Letter of Credit) and T/T (Telegraphic Transfer).
Q:What is the lead time for delivery?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Concrete Slab Formwork with Shoring Prop and Timber Beam H20
Made-in-China.com
Aluminium Profile-Al Panel Wall and Alu Slab-Alm Formwork
Made-in-China.com
Tecon H20 Timber Beam Slab&Beam Formwork for Large Area

Tecon H20 Timber Beam Slab&Beam Formwork for Large Area

US$50.00-150.00
300 Square Meters(MOQ)
Made-in-China.com
Aluminium Profile-Al Panel Wall and Alu Slab-Alm Formwork
Made-in-China.com