Powered by Made-in-China.com
Tecon Automatic Hydraulic Self Climbing Formwork for Bridge Pier Construction
US$3,000.00-5,000.00
2 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionHigh Carring Capacity
80kn Per CylinderModel NO.
TECON Self-climbing FormworkSpeed
0.5 Hours Per ClimbingHight
4.5m, 5m, >5mProduct Name
Hydraulic Self-Climbing Steel Formwork for ConstruFeature
Steady&High-Safety Progress During Self-ClimbingTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
50000sets/ YearKey features
Crane-Free Self-Climbing: Automatically climbs without needing a crane lift for efficient high-rise construction.
High Safety System: Features double embedding anchor system and climbing shoes for trustworthy safety.
Fast Climbing Speed: Climbs per floor in around 0.5 hours, significantly improving project efficiency.
High Reutilization Rate: Up to 90% reutilization rate from different projects, saving costs.
Customized Planning: Adapts to different geometry plans and floor heights via customized planning.
Sealed Protection: Fully sealed outer protection reduces weather effects and ensures safety.
On-Site Supervision: Suppliers send supervisors to your site for training and supervision.
Quality Certification: Certification of Quality issued after inspection, meeting destination authority requirements.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Does the formwork require a crane for climbing?
A:
No, the self-climbing platform can climb automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed per floor is around 0.5 hours.
Q:What is the carrying capacity of the operation layer?
A:
It supports simultaneous operation of 2 steps at 3 kN per cubic-meter or 3 steps at 2 kN per cubic-meter.
Q:Is the formwork customizable for different project needs?
A:
Yes, it adapts to different geometry plans and floor heights via customized planning.
Q:What safety features are included?
A:
It features a double embedding anchor system and climbing shoes for trustworthy safety.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Yellow Waterproof H20 Timber Beams for Concrete Formwork Construction
US$12.66-13.93
100 Pieces(MOQ)
Solid-Web H20 Timber I-Joist with High Load Capacity for Heavy-Duty Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
High-Strength Reusable H20 Timber I-Joist for Concrete Formwork and Construction Support
US$8.56-10.56
100 Pieces(MOQ)
Yellow H20 Timber Beams Wooden Construction Materials for Concrete Formwork
US$12.66-13.93
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Tecon Low Price Sef-Climbing Formwork for High-Rise Building Construction
US$3,000.00-5,000.00
2 Sets(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
Tecon Hydraulic Auto Climbing Formwork System for Bridge or High-Rise Building
US$3,000.00-5,000.00
2 Sets(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Flexible Slab Formwork with Expert Support for Apartment Construction Projects
US$65.00
250 Square Meters(MOQ)
Aluminum Building Formwork Extrusion Profile for Concrete Construction
US$2,200.00-2,800.00
1 Ton(MOQ)
Tecon Self Climbing Formwork System for High Rise Buildings
US$3,000.00-5,000.00
2 Sets(MOQ)
Durable Plastic Construction Formwork System for Easy Assembly
US$20.00-55.00
200 PCS(MOQ)
Tecon Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building
US$3,000.00-5,000.00
2 Sets(MOQ)
Premium 6063 CNC Aluminum Formwork with CE Certification for Construction
US$10.00-15.00
10 Pieces(MOQ)
Reliable Slab Formwork with Online Support for Apartment Construction Projects
US$65.00
250 Square Meters(MOQ)



















