Powered by Made-in-China.com
Tecon Automatic Modular Self Climbing Formwork
US$3,000.00-5,000.00
2 Sets
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionHigh Carring Capacity
80kn Per CylinderModel NO.
TECON Self-climbing FormworkSpeed
0.5 Hours Per ClimbingHight
4.5m, 5m, >5mProduct Name
Hydraulic Self-Climbing Steel Formwork for ConstruFeature
Steady&High-Safety Progress During Self-ClimbingTransport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
848060Production Capacity
50000sets/ YearKey features
Self-Climbing Efficiency: Climbs automatically without crane lift, speed around 0.5 hours per floor.
High Safety & Stability: Fully sealed platform with double embedding anchor system and climbing shoes.
Customizable Dimensions: Height adapts to 4.5m, 5m, or >5m via customized planning for different floors.
High Reutilization Rate: Up to 90% reutilization rate across different construction projects.
Strong Load Capacity: High carrying capacity of 80kN per cylinder for safe simultaneous operations.
Comprehensive Service: Includes technical planning, on-site supervision, training, and QC inspection.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:Does the formwork require a crane for climbing?
A:
No, the TECON Self-climbing Platform can climb automatically without the need for a crane lift.
Q:What is the climbing speed per floor?
A:
The climbing speed per floor is around 0.5 hours.
Q:What are the available height options?
A:
The height can be customized to 4.5m, 5m, or greater than 5m to adapt to different floor heights.
Q:What is the carrying capacity of the system?
A:
The system features a high carrying capacity of 80kN per cylinder.
Q:Is the formwork reusable for other projects?
A:
Yes, it has a reutilization rate of up to 90% from different projects.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Manufacturing High Strength Reusable Steel Formwork for Construction Concrete
US$80.00
30 Square Meters(MOQ)
H20 I-Joist Timber Beam with High-Strength Design for Wall Slab and Formwork
US$8.56-10.56
100 Pieces(MOQ)
Solid-Web H20 Timber I-Joist with High Load Capacity for Heavy-Duty Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)
Steel Frame Formwork Is Suitable for Various Types of Construction Projects
US$80.00
30 Square Meters(MOQ)
Manufacturer-Direct H20 Timber I-Joist with Waterproof WBP Glue for Building Formwork
US$8.56-10.56
100 Pieces(MOQ)
Stable Reliable H20 Formwork Support System for Concrete Construction
US$12.66-13.93
100 Pieces(MOQ)
Reusable High-Strength System Concrete Construction Steel Formwork
US$50.00
30 Square Meters(MOQ)
Reusable and Convenient Steel Frame Formwork
US$80.00
30 Square Meters(MOQ)
I-Beam Wooden Beam for China Formwork Reinforcement
US$8.00
200 Pieces(MOQ)
Tecon Modular Automatic Climbing Formwork, Auto Climbing System for High Rise Building
US$3,000.00-5,000.00
2 Sets(MOQ)
I-Beam Reinforcement Accessories for Reinforcing Plastic Formwork
US$8.00
200 Pieces(MOQ)
Tecon Automatic Hydraulic Self Climbing Formwork for High Rise Building
US$3,000.00-5,000.00
2 Sets(MOQ)
Modular PVC Permanent Formwork Eco Friendly Plastic Concrete Shuttering for Fast Site Installation
US$1,400.00-1,500.00
10 Tons(MOQ)
Innovative Modular Formwork Systems Peri Doka Formwork for Modern Projects
US$100.00
2,000 Pieces(MOQ)
I-Beam Reinforcement Wood Accessories for The Plastic Formwork System
US$8.00
200 Pieces(MOQ)
Tecon Automatic Self Climbing Formwork System
US$3,000.00-5,000.00
2 Sets(MOQ)
Modular UPVC Plastic Formwork System for Efficient Construction
US$15.00
100 Sets(MOQ)
Tecon Steel Wood Q235 Building Material Automatic Self Climbing Formwork
US$3,000.00-5,000.00
2 Sets(MOQ)
Advanced Modular Formwork Systems Ceiling Formwork for Shandong Projects
US$100.00
2,000 Pieces(MOQ)



















