SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Base 20 Engineered Timber Beams - Concrete-Ready Wall Formwork Solutions
US$75.00-130.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Warranty

1 Year

Model NO.

TECON Base 20 Formwork

Certification

CE

Material

Timber

Type

Wall Formwork

System Type

Timber Wall Formwork

Materials

Imported Spruce Wood, H20 Timber Beam

Formwork Weight

65 Kg/Sqm

Max Unit Size

5×6 M

Max One-Time Casting Height

12 M

Max Bearing Capacity

90 kN/Sqm

Installation Time

100 Sqm/Day/Unit (a Group 4-6 People)

Formlining

18/21 mm Plywood

Size and Shape

Customized

Handling Method

Tower Crane

Load Quantity

Around 350 Sqm/40 Hq Container

Transport Package

by Pallet or as Cusomized

Specification

Customized

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Customized Concrete Pressure: Permits fresh concrete pressure up to 80kN/Sqm or customized to project needs.
Customized Color Options: Available in Red or customized colors to match specific project requirements.
Customized Standard & Packing: Standards and packing methods (pallet or customized) are fully adaptable.
On-Site Supervision Service: Provided for most global projects, excluding specific restricted regions.
High-Quality Timber Beam: Features imported Spruce/Pine flange with a usage life of around 2 years.
Durable Steel Components: Steel parts made of Q235/Q355 with powder coated or galvanized finishes.
1-Year Warranty Coverage: Includes a comprehensive 1-year warranty for mechanical equipment.
Extensive Stock Availability: Holds 5000 sqm plastic formwork, 2000 sqm frame formwork, and Alu-Flex in stock.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tecon Timber Beam Formwork for Core Wall and Columns Construction
Made-in-China.com
Tecon Building Material Timber Beam Wall Formwork Similar Doka/Peri
Made-in-China.com
Tecon Wall/Column Formwork System Consisted by H20 Timber Beam
Made-in-China.com