SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Deck Formwork System for Slab Casting
US$100.00-160.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

System Type

Aluminum Panel Slab Formwork

Model NO.

TECON Aluflex formwork

Material

6061-T6 / 6082-T6 Aluminum Alloy

Feature

Light Weight

Panel Weight

11.31 Kg/M²

Max Panel Size

1800*1800 mm

Panel Depth

142mm

Max Permissible Slab Thickness

400mm

Installation Time

180 M²/Person/Day

Surface Treatment

Powder-Coated

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

761090

Production Capacity

500000sqm/ Year

Key features

Global On-Site Supervision: Provides on-site supervision services for most projects worldwide.
Ready Stock Availability: Maintains stock of 5000 sqm Plastic formwork and 2000 sqm HETO Frame formwork.
Wide Thickness Capacity: Supports maximum permissible slab thickness up to 400mm.
Cost-Effective Solution: Delivers labor saving and great cost reduction through advanced system design.
Flexible Payment Terms: Accepts payment via T/T or L/C for secure transactions.
Standardized Packaging: Uses standard steel or wooden pallets suitable for container transportation.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list, or send structural drawings and project information for a complete formwork & scaffolding proposal.
Q:What is the payment term?
A:
We accept payment by T/T or L/C.
Q:Are you a factory?
A:
Yes, we are a factory.
Q:Do you have products in stock?
A:
Yes, we have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork, and Alu-Flex slab formwork in stock, ready to ship.
Q:What is the lead time?
A:
Preparation for stock items is 10-15 days. H20 timber beam and TECON-Form Shuttering take 15-25 days. Other systems take 30-45 days. Contact us for accurate times based on quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

GPS Magnetic Formwork System

GPS Magnetic Formwork System

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com
Tecon Factory Direct Supply Self Climbing Scaffold Systems
Made-in-China.com
Tecon Automatic Self Climbing Scaffold Systems for Sale

Tecon Automatic Self Climbing Scaffold Systems for Sale

US$60.00-110.00
300 Square Meters(MOQ)
Made-in-China.com
Magnetic Shuttering System

Magnetic Shuttering System

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com
Magnetic Shuttering System

Magnetic Shuttering System

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com
Light Weight Fly Ash AAC Building Wall Block High Quality Block
Made-in-China.com
Alc Lightweight Concrete Building Block AAC Wall Cladding Block
Made-in-China.com
Eastland Specifications Light Weight AAC Block Insulation Block
Made-in-China.com