SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Film Faced Plywood Construction Concrete Template Formwork for Building
US$50.00-150.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Warranty

1 Year

Model NO.

flex 20

Material

Wood and Steel

Usage

for Slab and Decking

Type

Slab Formwork

Size

Customized

Permitted Fresh Concrete Pressure

Customized

Plywood Thickness

18/21mm

Biggest Advantage

Easy to Assemble

Certificate

CE

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Customized Size & Pressure: Size and permitted fresh concrete pressure are fully customized to meet project needs.
Wide Stock Availability: 5000 sqm plastic formwork and 2000 sqm frame formwork kept in stock for immediate shipping.
On-Site Supervision: Professional on-site supervision service provided for most projects worldwide.
CE Certified Quality: Products hold CE certification ensuring high quality and safety standards.
Easy Assembly Design: Biggest advantage is easy to assemble, increasing productivity and saving labor.
Flexible Payment Terms: Accepts T/T or L/C payment methods for convenient transactions.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤24hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
Send your material list, structural drawing, and project information via contacts for a complete proposal.
Q:What is the payment term?
A:
We accept payment by T/T or L/C.
Q:Are you a factory?
A:
Yes, we are a factory.
Q:Do you have in stock?
A:
Yes, we have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork, and Alu-Flex slab formwork in stock.
Q:What is the lead time?
A:
Stock items take 10-15 days for loading. H20 timber and TECON-Form take 15-25 days. Other systems take 30-45 days.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Aluminum Formwork for Concrete Building

Aluminum Formwork for Concrete Building

US$2,200.00-2,800.00
1 Ton(MOQ)
Made-in-China.com
Tecon Modular Concrete Slab Formwork for Construction

Tecon Modular Concrete Slab Formwork for Construction

US$50.00-150.00
300 Square Meters(MOQ)
Made-in-China.com
Aluminium Formwork for Concrete Construction

Aluminium Formwork for Concrete Construction

US$2,200.00-2,800.00
1 Ton(MOQ)
Made-in-China.com
Tecon Table Formwork for Slab Concrete Construction

Tecon Table Formwork for Slab Concrete Construction

US$70.00-110.00
300 Square Meters(MOQ)
Made-in-China.com