SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Flexible Slab Formwork H20 Timber Beam Concrete Mold Flex Plywood Form for Concrete Building Construction
US$50.00-150.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Warranty

1 Year

Main Components

18/21mm Tecon-Form Birch Plywood, H20 Timber Beam

Standard Shoring

Class D or E Heavy Duty Prop (En1065)

Max Permissible Slab Thickness

1000 mm

Size and Shape

Can Be Customized to Meet All Requirements

Assembly Method

Manpower Assembly at Site for Every Floor

Early Dismantle System

Available

Load Quantity

Around 350 Sqm/40 Hq

Application

Slab & Beam in Buildings, Factories, Tanks and FL

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Customizable Size and Shape: Can be customized to meet all specific project requirements.
High Load Capacity: Supports around 350 Sqm per 40 HQ container.
On-Site Supervision: Available for most projects worldwide except restricted regions.
Fast Lead Time: 10-15 days for stock items; 15-25 days for H20 timber beam systems.
Quality Warranty: 1 Year warranty coverage for mechanical defects.
Flexible Payment Terms: Accepts T/T or L/C for secure transactions.
Ready Stock Availability: 5000 sqm Plastic formwork and 2000 sqm Frame formwork in stock.
Complete Documentation: Includes user manual, calculation, shop drawing, and assembly drawings.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤24hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
Send your material list, structural drawing, and project information via our contacts for a complete proposal.
Q:What is the payment term?
A:
We accept payment by T/T or L/C.
Q:Are you a factory?
A:
Yes, we are a factory.
Q:Do you have in stock?
A:
Yes, we have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork, and Alu-Flex slab formwork in stock, ready to ship.
Q:What is the lead time?
A:
Stock items take 10-15 days. H20 timber beam systems take 15-25 days. Other systems take 30-45 days. Contact us for accurate times based on quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

WPC Wall panel for Outdoor

WPC Wall panel for Outdoor

US$3.99
1,000 Meters(MOQ)
Made-in-China.com
Zhongtian Polybett Phenolic Laminate Toilet Door Panel
Made-in-China.com