Powered by Made-in-China.com
Tecon Flying Table Formwork System for Large Area Concrete Slab Construction
US$70.00-110.00300 Square Meters
Tecon Flying Table Formwork System for Large Area Concrete Slab Construction
US$70.00-110.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionWarranty
1 YearModel NO.
TECON Slab Table FormworkSystem Type
Timber Slab FormworkMaterials
Imported Spruce Wood, H20 Timber BeamStandard Shoring
Class D/E Heavy Duty Prop (En 1065)Max Unit Size
4×6 MMax Permissible Slab Thickness
1000 mmInstallation Time
200 Sqm/Day/Unit (5 People)Formlining
18/21 mm Plywood; Plastic Board; PP BoardHandling Method
Trolley/Tower CraneLoad Quantity
Around 300 Sqm/40 Hq Container (with Accessories)Transport Package
by Pallet or as CusomizedSpecification
SGSTrademark
TECONOrigin
ChinaHS Code
730840Production Capacity
500000sqm/ YearKey features
Customized Concrete Pressure: Permitted fresh concrete pressure can be customized to meet specific project requirements.
Customized Packing Options: Packing available by standard pallet or customized according to customer needs.
On-Site Supervision Service: Professional on-site supervision provided for most global projects excluding restricted regions.
1-Year Warranty Coverage: Comprehensive 1-year warranty provided for mechanical equipment and formwork systems.
Large Area Slab Application: Specifically designed for large area slab projects with heights up to 5.0 meters.
High Load Capacity: Supports slab thickness up to 450 mm with a weight of 43.86kg per square meter.
SGS Standard Compliance: Products manufactured and tested according to SGS international standards.
Flexible Transportation: Transportation options include trolley or crane for efficient site handling.
Company profile

Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Durable Slab Formwork Ceiling Formwork Systems for Apartment Use
US$100.00
2,000 Pieces(MOQ)
Reliable Ceiling Formwork Kits Meva Formwork Systems for Heavy Duty Use
US$100.00
2,000 Pieces(MOQ)
GPS Magnetic Formwork System
US$0.01-100.00
50 Pieces(MOQ)
Heavy Duty Ceiling Formwork Modular Formwork Systems for Apartments
US$100.00
2,000 Pieces(MOQ)
Reliable Ceiling Formwork Kits Meva Formwork Systems for Modern Design
US$100.00
2,000 Pieces(MOQ)
Tecon Automatic Self Climbing Scaffold Systems for Sale
US$60.00-110.00
300 Square Meters(MOQ)
Tecon Factory Direct Supply Self Climbing Scaffold Systems
US$60.00-110.00
300 Square Meters(MOQ)
Magnetic Shuttering System
US$0.01-100.00
50 Pieces(MOQ)
Magnetic Shuttering System
US$0.01-100.00
50 Pieces(MOQ)
Construction Shuttering Board Phenolic Plywoods Black Finger Joint Recycled Concrete Formwork Film Faced Plywood
US$10.00-12.00
5,000 piece(MOQ)
Tecon Black Film Faced Plywood with Poplar Core
US$10.00-80.00
50 Pieces(MOQ)
Construction Concrete Template Formwork Plywood 18mmfob Reference
US$4.50-6.00
5,000 Pieces(MOQ)
Tecon Finger Joint Construction Printing Brown Film Faced Plywood
US$10.00-80.00
50 Pieces(MOQ)
High Quality Film Faced Plywood /Marine Plywood for Building Materiar or Decoraction Metarial Hardwood
US$8.10-8.25
560 Pieces(MOQ)
High Quality Film Faced Plywood /Marine Plywood for Building Materiar or Decoraction Metarial
US$8.00-8.20
550 Pieces(MOQ)
Tecon Finger- Joint Core Film Faced Plywood for Construction
US$10.00-80.00
50 Pieces(MOQ)
Film Faced Birch Hardwood Plywood Board Shuttering Marine Plywood Sheet Manufacturer
US$14.80-17.50
500 Meters(MOQ)
Film Faced for Construction Plywood 12mm Single Film Face 4FT*8FT Plywood Brown Film Faced Plywood
US$2.00-18.00
5,000 piece(MOQ)
Tecon Construction Material Concrete Peri Slab Formwork Price Film Faced Plywood
US$10.00-80.00
50 Pieces(MOQ)
Film Faced Plywood
US$9.60-14.28
1,000 pcs(MOQ)



















