SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Formwork Quick Release Table Form Perfect Slab Formwork Solution for Flatslab
US$70.00-110.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on- Site Supervision

Warranty

1 Year

Model NO.

TECON Slab Table Formwork

Material

Wood and Steel

Permitted Fresh Concrete Pressure

Customized

Standard Size

with Lengths of 4.00 M or 5.00 M and Widths of 2.0

Height

Can Be up to 5.0m

Usage

for Large Area Slab Porject

Transportation

by Trolley or Crane

Max Size

4 * 6 Meters

Max Slab Thickness

450 mm

Weight

43.86kg/Sqm

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

Customized Concrete Pressure: Permitted fresh concrete pressure can be customized to meet specific project requirements.
Flexible Height Options: Height can be adjusted up to 5.0 meters to accommodate various slab construction needs.
Large Area Coverage: Designed specifically for large area slab projects with standard lengths of 4.00m or 5.00m.
On-Site Supervision: Professional on-site supervision service available for most projects worldwide.
1 Year Warranty: Comprehensive 1-year warranty coverage provided for all mechanical equipment.
Multiple Stock Options: 5000 sqm plastic formwork and 2000 sqm frame formwork available in stock for immediate shipping.
Buy Back System: Buy back system offered for medium and big scale projects to support client investment.
Global Agent Network: Looking for agents and distributors worldwide with special policies to support success.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤18hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tecon Table Formwork for Slab Concrete Construction

Tecon Table Formwork for Slab Concrete Construction

US$70.00-110.00
300 Square Meters(MOQ)
Made-in-China.com
Reusable and Convenient Steel Frame Formwork
Made-in-China.com
Tecon Wooden Slab Formwork System for Building Materials
Made-in-China.com