Powered by Made-in-China.com
Tecon H20 Timber Beam Formwork System for Core Wall and Columns Construction
US$75.00-130.00
300 Square Meters
Product profile
Customization
AvailableAfter-sales Service
on- Site SupervisionWarranty
1 YearModel NO.
TECON Base 20 FormworkMaterial
TimberType
Wall FormworkPermitted Fresh Concrete Pressure
80kN/Sqm or CustomizedShuttering
Film Faced Plywood 1220*2440*18mmH20 Timber Beam
Imported Spruce/Pine Flange, En13377Usage of Timber Beam
Around 2 YearsWeight
65kg/SqmColor
Red or CustomizedOther Steel Parts
Q235/Q355; Powder Coated or Galvanized etcSteel Waler
2[12 or 2[10Transport Package
by Pallet or as CusomizedSpecification
CustomizedTrademark
TECONOrigin
ChinaHS Code
730840Production Capacity
500000sqm/ YearKey features
Customized Concrete Pressure: Permitted fresh concrete pressure is 80kN/Sqm or fully customized to project needs.
Customized Color Options: Available in Red or fully customized colors to match specific project requirements.
Premium Timber Material: H20 timber beams made from imported Spruce/Pine flange meeting En13377 standards.
Long Service Life: Timber beams designed for approximately 2 years of usage in construction projects.
On-Site Supervision: Professional on-site supervision service provided for most projects worldwide.
1 Year Warranty: Comprehensive 1-year warranty coverage provided for all mechanical equipment.
Fast Stock Delivery: Ready stock available for climbing formwork and plastic formwork with 10-15 day prep.
Buy Back System: Buy back system offered for medium and big scale projects to support clients.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East
Product Q&A
Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.
Send Inquiry
*To:
Suzhou TECON Construction Technology Co., Ltd.
Suzhou TECON Construction Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Lightweight Plastic Formwork System for Fast Concrete Construction Residential and Commercial Buildings
US$5.00-50.00
180 Square Meters(MOQ)
Efficient Plastic Formwork System for Versatile Wall and Column Applications
US$55.00-65.00
100 Square Meters(MOQ)
Premium Wooden Beam Formwork System for Construction Projects
US$98.00-108.00
500 Square Meters(MOQ)
High Strength Plastic Formwork System for Concrete Fast Installation and Multiple Reuse
US$5.00-50.00
180 Square Meters(MOQ)
Adjustable High-Pressure Formwork Systems for Reusable Wall Construction
US$68.00-88.00
300 Square Meters(MOQ)
Lightweight Customized Formwork Systems for Easy Wall and Column Construction
US$75.00-129.00
100 Square Meters(MOQ)
Durable High-Pressure Wall Formwork Systems for Construction Efficiency
US$68.00-88.00
300 Square Meters(MOQ)
Modular Steel Shuttering System for Concrete Walls and Columns
US$16.00-35.00
20 Pieces(MOQ)
Complete Aluminum Wall and Slab Formwork System with Accessories for Concrete Structures
US$5.00-50.00
180 Square Meters(MOQ)
ABS Adjustable Plastic Column Formwork System for Versatile Construction Trio Wall Formwork Shutter
US$5.00-50.00
180 Square Meters(MOQ)
Customized Modern H20 Model Timber Beam Formwork System for Construction
US$87.00-97.00
50 Square Meters(MOQ)
Versatile Steel Formwork System for Efficient Wall and Column Construction
US$89.00-139.00
100 Square Meters(MOQ)
Durable and Affordable Wall Formwork Systems for Construction
US$75.00-129.00
100 Square Meters(MOQ)
Hot Sale Steel Framed Formwork System for Slab Beam Column Wall Forming
US$100.00-120.00
100 Square Meters(MOQ)
Aluminum Formwork System for Durable and Efficient Wall Construction
US$130.00-135.00
100 Square Meters(MOQ)
Rapid Reusable Steel Frame Concrete Formwork System for Concrete Wall and Column Complete Piece Birch Plywood
US$59.00-99.00
50 Pieces(MOQ)
Aluminum Round Wall and Column Formwork System for Construction Buildings
US$160.00-200.00
800 Square Meters(MOQ)
Lianggong H20 Timber Beam Formwork System for Concrete
US$5.60-5.80
1,000 Meters(MOQ)
Easy Clean Firm Steel Green Wall Formwork System for House Renovation
US$90.00
500 Square Meters(MOQ)
Reliable Column Formwork Systems for Efficient and Sustainable Building Projects
US$85.00-110.00
250 Square Meters(MOQ)



















