SourcingAI
Try for free
Powered by Made-in-China.com
Tecon Heto Concrete Wall Formwork Steel Frame Formwork System for Commercial Building Construction
US$85.00-140.00
300 Square Meters

Product profile

Customization

Available

After-sales Service

on-Site Supervision

Warranty

1 Year+

Material

Q355 Steel Profile

Panel Weight

35.3 Kg/M2

Max Panel Size

3*0.9 M

Panel Depth

73 mm

Max Permissible Fresh Concrete Pressure

60 kN/M2

Installation Time

100-200 M2/2 Person/Day

Formlining

15 mm Tecon-Form Birch Plywood

Surface Treatment

Powder-Coated

Handling Method

Tower Crane

Transport Package

by Pallet or as Cusomized

Specification

SGS

Trademark

TECON

Origin

China

HS Code

730840

Production Capacity

500000sqm/ Year

Key features

High-Strength Steel Frame: Constructed with Q355 steel profile for maximum durability and load-bearing capacity.
Powder-Coated Surface: Features powder-coated treatment for enhanced corrosion resistance and longevity.
On-Site Supervision: Professional on-site supervision service available for most global projects.
Customized Packing: Packing options include standard steel pallets, wooden pallets, or fully customized solutions.
High Installation Efficiency: Capable of installing 100-200 square meters per day by two personnel.
Stock Availability: Maintains significant stock of plastic, frame, and aluminum formwork for immediate shipping.
SGS Certified Standard: Products meet rigorous SGS standards for quality and safety assurance.
Buy-Back System: Offers buy-back system for medium and large-scale projects to reduce costs.

Company profile

Suzhou TECON Construction Technology Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamSelf-branded
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2014-03-01Nearest Port: Shanghai, Ningbo, LianyungangAverage Response Time: ≤15hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

Address901-905, Building a, Suzhou Bay Central Plaza, Wuzhong District, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsFormwork, Plastic Formwork, Heavy Duty Steel Prop, Scaffolding, Film Faced Plywood, Wall Formwork, Slab Formwork, Frame Formwork, Column Formwork

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East

Product Q&A

Q:How to get a quotation?
A:
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Q:What is the payment term?
A:
By T/T or L/C.
Q:Are you a factory?
A:
Yes, we are.
Q:Do you have in stock?
A:
Yes, we do. We have 5000 sqm Plastic formwork TP60, 2000 sqm HETO Frame formwork and Alu-Flex slab formwork in stock and they are ready to ship.
Q:What is the lead time?
A:
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days. For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days. For other system, the lead time is from 30 to 45 days. For more accurate lead time, please contact us for specific product based on your quantity.

Send Inquiry

*To:Suzhou TECON Construction Technology Co., Ltd.Suzhou TECON Construction Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

GPS Magnetic Formwork System

GPS Magnetic Formwork System

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com
Tecon Automatic Self Climbing Scaffold Systems for Sale

Tecon Automatic Self Climbing Scaffold Systems for Sale

US$60.00-110.00
300 Square Meters(MOQ)
Made-in-China.com
Magnetic Shuttering System

Magnetic Shuttering System

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com
Magnetic Shuttering System

Magnetic Shuttering System

US$0.01-100.00
50 Pieces(MOQ)
Made-in-China.com
Tecon Factory Direct Supply Self Climbing Scaffold Systems
Made-in-China.com
External Wall AAC Block Autoclaved Aerated Concrete Alc Block
Made-in-China.com
Outdoor Wall Cladding PVDF Aluminum Composite Panel

Outdoor Wall Cladding PVDF Aluminum Composite Panel

US$6.00-10.00
600 Square Meters(MOQ)
Made-in-China.com